2018Journal of Cleaner ProductionRequires access

A model for simulating schedule risks in prefabrication housing production: A case study of six-day cycle assembly activities in Hong Kong

Clyde Zhengdao Li, Xiaoxiao Xu, Qiping Shen, Cheng Fan, Xiao Li, Jingke Hong

Open publisher page 108 citations

Abstract

This record does not include an abstract. Use the full-text link above if available.

About this research paper

What this paper is about

An abstract is not available in the OpenAlex record for this paper.

Why it matters

OpenAlex reports 108 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Key concepts: Prefabrication, Schedule, Precast concrete, Building information modeling, Inefficiency, Production (economics), Engineering, Transport engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
A model for simulating schedule risks in prefabrication housing production: A case study of six-day cycle assembly activities in Hong Kong — Research Paper | ScholarLens