2018Journal of mining and environmentRequires access

Simulation of tunnel boring machine utilization: A case study

Sayfoddin Moosazadeh, Hamid Aghababaie, Seyed Hadi Hoseinie, Behzad Ghodrati

Open publisher page 7 citations

Abstract

Utilization is one of the main managerial factors that is applied for construction process analysis well. It directly affects the project duration and construction costs. Therefore, a utilization s ...

About this research paper

What this paper is about

Utilization is one of the main managerial factors that is applied for construction process analysis well. It directly affects the project duration and construction costs. Therefore, a utilization s ...

Why it matters

OpenAlex reports 7 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Utilization is one of the main managerial factors that is applied for construction process analysis well. It directly affects the project duration and construction costs. Therefore, a utilization s ...

Key concepts: Engineering, Forensic engineering, Civil engineering, Mining engineering, Environmental science, Architectural engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Simulation of tunnel boring machine utilization: A case study — Research Paper | ScholarLens