Simulation of Ancillary Services in Thermal Power Plants in Energy Systems With High Impact of Renewable Energy
Moritz Huebel, Conrad Gierow, Jens Hinrich Prause, Sebastian Meinke, Egon Hassel
Abstract
Moritz Huebel, Conrad Gierow, Jens Hinrich Prause, Sebastian Meinke, Egon Hassel
Abstract
In many parts of the world, the impact of renewable energy, especially from intermittent sources as wind and solar is continuously increasing. In Germany, the share of renewable energy in electricity production is believed to increase from 32.5% in 2015 to 50% in 2030. In order to operate an electrical system and control the mains frequency, the power supply must match the consumption at any time. Ancillary services like primary and secondary control are used to balance the system on a time-scale of several seconds up to 15 minutes. Those control reserves are usually provided by thermal power plants. Particularly in times of high shares of fluctuating renewable feed-in, thermal power plants are turned off or operated at minimum load to avoid electricity production at low electricity prices. However, an amount of about 3000 MW of fast responding primary control need to be provided in the European network of transmission system operators for electricity grid to maintain stable operation even in case of two simultaneous large unit outages. This requirement leads to situations, where thermal power plants are operated in minimum load below their marginal cost to provide control reserves even if there is a surplus of energy in the grid. Operation in low load while at the same time providing control reserves leads to new challenges. As the relation between energy production and the thermal storage capacities provided by the metal and fluid mass in the boiler is decreasing with the load, the ability of responding to control demands is naturally slowed down. Dynamic simulation of the thermodynamic power plant process turned out to be an efficient method to investigate such operational modes. Using comprehensive process models coupled with a control system model, equipment adaptions or control system updates can be evaluated in order to provide faster responses. By increasing the specific amount of ancillary services per unit, the number of units necessary to provide the total amount of primary and secondary control could be reduced in situations with energy surplus.
OpenAlex reports 8 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
In many parts of the world, the impact of renewable energy, especially from intermittent sources as wind and solar is continuously increasing. In Germany, the share of renewable energy in electricity production is believed to increase from 32.5% in 2015 to 50% in 2030. In order to operate an electrical system and control the mains frequency, the power supply must match the consumption at any time. Ancillary services like primary and secondary control are used to balance the system on a time-scale of several seconds up to 15 minutes. Those control reserves are usually provided by thermal power plants. Particularly in times of high shares of fluctuating renewable feed-in, thermal power plants are turned off or operated at minimum load to avoid electricity production at low electricity prices. However, an amount of about 3000 MW of fast responding primary control need to be provided in the European network of transmission system operators for electricity grid to maintain stable operation even in case of two simultaneous large unit outages. This requirement leads to situations, where thermal power plants are operated in minimum load below their marginal cost to provide control reserves even if there is a surplus of energy in the grid. Operation in low load while at the same time providing control reserves leads to new challenges. As the relation between energy production and the thermal storage capacities provided by the metal and fluid mass in the boiler is decreasing with the load, the ability of responding to control demands is naturally slowed down. Dynamic simulation of the thermodynamic power plant process turned out to be an efficient method to investigate such operational modes. Using comprehensive process models coupled with a control system model, equipment adaptions or control system updates can be evaluated in order to provide faster responses. By increasing the specific amount of ancillary services per unit, the number of units necessary to provide the total amount of primary and secondary control could be reduced in situations with energy surplus.
Key concepts: Renewable energy, Wind power, Electric power system, Stand-alone power system, Electricity generation, Environmental science, Electricity, Base load power plant