2013•Unpublished venueRequires access

Environmental Assessment for Multiple Projects at Laughlin Air Forc Base, TX

Thomas E. Murphy

Open publisher page 0 citations

Abstract

Abstract : Laughlin AFB proposes to implement several projects in order to improve its operational efficiency and to address ground and flight safety deficiencies at the airfield. Collectively, the projects would involve demolishing 23 facilities; replacing them with facilities that meet Air Force facility requirements, are energy efficient, have a lower operating cost than current facilities, enhance mission accomplishment, and improve the stormwater drainage system and slopes at the Laughlin AFB airfield. The Proposed Action would consist of the following separate projects * Demolish the Aerospace Physiology Facility (Building 380) and construct a new building directly southwest of the Flight Simulator Facility (Building 238) * Demolish 21 existing housing units (Buildings 9200-9220) and construct a new 37,391 square foot (SF) Student Officer Quarters at a site approximately 500 feet southwest of Building 446 * Demolish the existing outdoor small arms range (Building 1100), and construct a new 36,560 SF fully-contained indoor range approximately 600 feet to the north; and * Repair and improve stormwater drainage and steep slopes at the Laughlin AFB airfield. Alternatives for the proposed projects were evaluated as part of this EA including the No Action Alternative. Additionally, several alternatives were eliminated from further consideration during the scoping process.

About this research paper

What this paper is about

Abstract : Laughlin AFB proposes to implement several projects in order to improve its operational efficiency and to address ground and flight safety deficiencies at the airfield. Collectively, the projects would involve demolishing 23 facilities; replacing them with facilities that meet Air Force facility requirements, are energy efficient, have a lower operating cost than current facilities, enhance mission accomplishment, and improve the stormwater drainage system and slopes at the Laughlin AFB airfield. The Proposed Action would consist of the following separate projects * Demolish the Aerospace Physiology Facility (Building 380) and construct a new building directly southwest of the Flight Simulator Facility (Building 238) * Demolish 21 existing housing units (Buildings 9200-9220) and construct a new 37,391 square foot (SF) Student Officer Quarters at a site approximately 500 feet southwest of Building 446 * Demolish the existing outdoor small arms range (Building 1100), and construct a new 36,560 SF fully-contained indoor range approximately 600 feet to the north; and * Repair and improve stormwater drainage and steep slopes at the Laughlin AFB airfield. Alternatives for the proposed projects were evaluated as part of this EA including the No Action Alternative. Additionally, several alternatives were eliminated from further consideration during the scoping process.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Abstract : Laughlin AFB proposes to implement several projects in order to improve its operational efficiency and to address ground and flight safety deficiencies at the airfield. Collectively, the projects would involve demolishing 23 facilities; replacing them with facilities that meet Air Force facility requirements, are energy efficient, have a lower operating cost than current facilities, enhance mission accomplishment, and improve the stormwater drainage system and slopes at the Laughlin AFB airfield. The Proposed Action would consist of the following separate projects * Demolish the Aerospace Physiology Facility (Building 380) and construct a new building directly southwest of the Flight Simulator Facility (Building 238) * Demolish 21 existing housing units (Buildings 9200-9220) and construct a new 37,391 square foot (SF) Student Officer Quarters at a site approximately 500 feet southwest of Building 446 * Demolish the existing outdoor small arms range (Building 1100), and construct a new 36,560 SF fully-contained indoor range approximately 600 feet to the north; and * Repair and improve stormwater drainage and steep slopes at the Laughlin AFB airfield. Alternatives for the proposed projects were evaluated as part of this EA including the No Action Alternative. Additionally, several alternatives were eliminated from further consideration during the scoping process.

Key concepts: Base (topology), Environmental science, Mathematics, Mathematical analysis

Related papers

Back to paper searchBrowse research topicsOriginal source
Environmental Assessment for Multiple Projects at Laughlin Air Forc Base, TX — Research Paper | ScholarLens