1991•Hydraulic EngineeringRequires access

Evaluation of Embankment Erosion at TVA's Chickamauga Project

Louis E. Buck

Open publisher page 0 citations

Abstract

Studies were made to evaluate the extent of erosion to be expected under probable maximum flood (PMF) conditions. The erosion studies were made using the EMBANK computer program. The results of the erosion study indicate that the embankment would not erode below the normal minimum pool. Additional analysis indicated that the extent of erosion was most sensitive to the differential between headwater and tailwater levels. This paper describes the procedures and results of the erosion study for the Chickamauga project.

About this research paper

What this paper is about

Studies were made to evaluate the extent of erosion to be expected under probable maximum flood (PMF) conditions. The erosion studies were made using the EMBANK computer program. The results of the erosion study indicate that the embankment would not erode below the normal minimum pool. Additional analysis indicated that the extent of erosion was most sensitive to the differential between headwater and tailwater levels. This paper describes the procedures and results of the erosion study for the Chickamauga project.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Studies were made to evaluate the extent of erosion to be expected under probable maximum flood (PMF) conditions. The erosion studies were made using the EMBANK computer program. The results of the erosion study indicate that the embankment would not erode below the normal minimum pool. Additional analysis indicated that the extent of erosion was most sensitive to the differential between headwater and tailwater levels. This paper describes the procedures and results of the erosion study for the Chickamauga project.

Key concepts: Tailwater, Erosion, Levee, Flood myth, Hydrology (agriculture), Environmental science, Geotechnical engineering, Geology

Related papers

Back to paper searchBrowse research topicsOriginal source
Evaluation of Embankment Erosion at TVA's Chickamauga Project — Research Paper | ScholarLens