Detrimental changes and construction projects: need for comprehensive controls

Yahya Rashid, Rashid Maqbool

Open publisher page 5 citations

Abstract

Changes are inevitable and put harmful effects on construction projects in the form of delay, cost overrun and productivity degradation. This study aimed to investigate the major causes of detrimental project changes in design and construction phases of construction projects of Pakistan, the mentioned phases are critical in project execution. Moreover, a set of change controls are also identified for minimising the intensity of negative effects of project changes. Data are collected through structured questionnaires from construction industry located in Pakistan. Various statistical data analysis techniques such as reliability analysis, validity analysis, correlation, multi co-linearity, and regressions analysis are performed for data analysis and results inference. The findings show that client associated project changes are most critical hindrance in the construction projects, and their intensity is more than other change factors. Moreover the 'freezing design' and 'clarify change order procedures' are found to be the most important change control methods to minimise the severity of the project variations. The study is expected to provide significant insights to the project managers so that they can formulate the strategies to address the change and its effects in construction projects.

About this research paper

What this paper is about

Changes are inevitable and put harmful effects on construction projects in the form of delay, cost overrun and productivity degradation. This study aimed to investigate the major causes of detrimental project changes in design and construction phases of construction projects of Pakistan, the mentioned phases are critical in project execution. Moreover, a set of change controls are also identified for minimising the intensity of negative effects of project changes. Data are collected through structured questionnaires from construction industry located in Pakistan. Various statistical data analysis techniques such as reliability analysis, validity analysis, correlation, multi co-linearity, and regressions analysis are performed for data analysis and results inference. The findings show that client associated project changes are most critical hindrance in the construction projects, and their intensity is more than other change factors. Moreover the 'freezing design' and 'clarify change order procedures' are found to be the most important change control methods to minimise the severity of the project variations. The study is expected to provide significant insights to the project managers so that they can formulate the strategies to address the change and its effects in construction projects.

Why it matters

OpenAlex reports 5 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Changes are inevitable and put harmful effects on construction projects in the form of delay, cost overrun and productivity degradation. This study aimed to investigate the major causes of detrimental project changes in design and construction phases of construction projects of Pakistan, the mentioned phases are critical in project execution. Moreover, a set of change controls are also identified for minimising the intensity of negative effects of project changes. Data are collected through structured questionnaires from construction industry located in Pakistan. Various statistical data analysis techniques such as reliability analysis, validity analysis, correlation, multi co-linearity, and regressions analysis are performed for data analysis and results inference. The findings show that client associated project changes are most critical hindrance in the construction projects, and their intensity is more than other change factors. Moreover the 'freezing design' and 'clarify change order procedures' are found to be the most important change control methods to minimise the severity of the project variations. The study is expected to provide significant insights to the project managers so that they can formulate the strategies to address the change and its effects in construction projects.

Key concepts: Change order, Cost overrun, Project management, Reliability (semiconductor), Risk analysis (engineering), Control (management), Construction industry, Pre-construction services