Life Cycle Assessment on Pulverized Coal Fired Heating Industry Boiler
Guoli Qi, Zhongwei Wang, Jian Guan, Song-Song Zhang, Xuemin Liu, Yongqiang Chang
Abstract
Guoli Qi, Zhongwei Wang, Jian Guan, Song-Song Zhang, Xuemin Liu, Yongqiang Chang
Abstract
By using life cycle assessment (LCA), to selective analysis pulverized coal fired heating industry boiler on construction cost, operational phase recourse and energy consumption, establish LCA list, and to carry out pulverized coal fired industry boiler resource consumption, energy consumption, environmental impact and cost evaluation, the result shows that in the entire boiler life cycle, coal has the largest resource depletion coefficient which reached 93% and the next was natural gas and the limestone; although the operational cost was obvious higher than the construction cost in the pulverized coal fired industry boiler’s internal cost, but construction cost still reached above 40% which related to the short operating time in single year of pulverized coal fired heating industry boiler; and the highest proportion of the boiler external cost was global warming.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
By using life cycle assessment (LCA), to selective analysis pulverized coal fired heating industry boiler on construction cost, operational phase recourse and energy consumption, establish LCA list, and to carry out pulverized coal fired industry boiler resource consumption, energy consumption, environmental impact and cost evaluation, the result shows that in the entire boiler life cycle, coal has the largest resource depletion coefficient which reached 93% and the next was natural gas and the limestone; although the operational cost was obvious higher than the construction cost in the pulverized coal fired industry boiler’s internal cost, but construction cost still reached above 40% which related to the short operating time in single year of pulverized coal fired heating industry boiler; and the highest proportion of the boiler external cost was global warming.
Key concepts: Pulverized coal-fired boiler, Boiler (water heating), Waste management, Coal, Engineering, Life-cycle cost analysis, Life-cycle assessment, Environmental science