1992Unpublished venueRequires access

Analysis of rubble mound breakwaters

John Dorrington Mettam

Open publisher page 19 citations

Abstract

Working Group 12 was set up by Permanent Technical Committee II of PIANC to consider the analysis of rubble mound breakwaters with a view to achieving a better understanding of safety aspects. This paper provides a very brief introduction to the work of the group. A practical way of evaluating safety has been developed (for use particularly with Hudson's formula or Van der Meer's formula for design of main armour stability) which enables a theoretical design to be evaluated more realistically in respect of varying probabilities of failure within specified design life. Its value has been demonstrated by examples based upon data collected. Methods are outlined for using partial coefficients to prepare preliminary designs, and then use hydraulic model testing to refine the preliminary design and provide the basis for final designs. SYNOPSIS INTRODUCTION CONCLUSIONS NOTATION

About this research paper

What this paper is about

Working Group 12 was set up by Permanent Technical Committee II of PIANC to consider the analysis of rubble mound breakwaters with a view to achieving a better understanding of safety aspects. This paper provides a very brief introduction to the work of the group. A practical way of evaluating safety has been developed (for use particularly with Hudson's formula or Van der Meer's formula for design of main armour stability) which enables a theoretical design to be evaluated more realistically in respect of varying probabilities of failure within specified design life. Its value has been demonstrated by examples based upon data collected. Methods are outlined for using partial coefficients to prepare preliminary designs, and then use hydraulic model testing to refine the preliminary design and provide the basis for final designs. SYNOPSIS INTRODUCTION CONCLUSIONS NOTATION

Why it matters

OpenAlex reports 19 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Working Group 12 was set up by Permanent Technical Committee II of PIANC to consider the analysis of rubble mound breakwaters with a view to achieving a better understanding of safety aspects. This paper provides a very brief introduction to the work of the group. A practical way of evaluating safety has been developed (for use particularly with Hudson's formula or Van der Meer's formula for design of main armour stability) which enables a theoretical design to be evaluated more realistically in respect of varying probabilities of failure within specified design life. Its value has been demonstrated by examples based upon data collected. Methods are outlined for using partial coefficients to prepare preliminary designs, and then use hydraulic model testing to refine the preliminary design and provide the basis for final designs. SYNOPSIS INTRODUCTION CONCLUSIONS NOTATION

Key concepts: Rubble, Breakwater, Armour, Notation, Engineering, Civil engineering, Set (abstract data type), Construction engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Analysis of rubble mound breakwaters — Research Paper | ScholarLens