LEBT Commissioning of the J-PARC LINAC

T. Shibata, Hiroyuki Asano, K. Ikegami, Yasuhiro Kondo, Yong Liu, T. Maruta, Akihiko Miura, F. Naito, H. Oguri, K. Ohkoshi, Akira Takagi

Open full text 0 citations

Abstract

After upgrade of J-PARC Linac in 2014, Low Energy Beam Transport (LEBT) beam commissioning of the J-PARC LINAC has been made for improving H-beam intensity extracted from Linac. Currents of two solenoid coils and steering magnets in LEBT are optimized with extraction and acceleration voltages for static acceleration in ion source (IS) which decides on an initial emittance diagram of H⁻ beam. As a result of LEBT and IS parameter optimization, beam transmission rate of RFQ has been reached up to 96 % in 50 mA H⁻ current operation. Moreover, PIC-MC (Particle-In-Cell Monte-Carlo) simulation model is developed for H⁻ transport in LEBT. Comparison between experimental and numerical results are presented to clarify beam physics from IS exit to RFQ entrance.

About this research paper

What this paper is about

After upgrade of J-PARC Linac in 2014, Low Energy Beam Transport (LEBT) beam commissioning of the J-PARC LINAC has been made for improving H-beam intensity extracted from Linac. Currents of two solenoid coils and steering magnets in LEBT are optimized with extraction and acceleration voltages for static acceleration in ion source (IS) which decides on an initial emittance diagram of H⁻ beam. As a result of LEBT and IS parameter optimization, beam transmission rate of RFQ has been reached up to 96 % in 50 mA H⁻ current operation. Moreover, PIC-MC (Particle-In-Cell Monte-Carlo) simulation model is developed for H⁻ transport in LEBT. Comparison between experimental and numerical results are presented to clarify beam physics from IS exit to RFQ entrance.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

After upgrade of J-PARC Linac in 2014, Low Energy Beam Transport (LEBT) beam commissioning of the J-PARC LINAC has been made for improving H-beam intensity extracted from Linac. Currents of two solenoid coils and steering magnets in LEBT are optimized with extraction and acceleration voltages for static acceleration in ion source (IS) which decides on an initial emittance diagram of H⁻ beam. As a result of LEBT and IS parameter optimization, beam transmission rate of RFQ has been reached up to 96 % in 50 mA H⁻ current operation. Moreover, PIC-MC (Particle-In-Cell Monte-Carlo) simulation model is developed for H⁻ transport in LEBT. Comparison between experimental and numerical results are presented to clarify beam physics from IS exit to RFQ entrance.

Key concepts: Project commissioning, Computer science, Political science, Publishing, Law