Simulation of Distance Relay for Load Encroachment Alleviation with Agent Based Supervision of Zone 3
Mohamed M. Badr, Nabil Abassy, Emtethal Negm Abdallah
Abstract
Open-access reader
Mohamed M. Badr, Nabil Abassy, Emtethal Negm Abdallah
Abstract
Open-access reader
Cascaded tripping of power lines due to mal-operation of zone-3 distance relays has been one of the main causes of many previous blackouts worldwide. Encroachment of load into zone-3 characteristics during stressed system operation conditions is a basic factor for such mal-operation of the relays. By improving the operation of zone-3, it is possible to prevent mal-operations so that cascaded line tripping can be avoided. For proper study of the behavior of distance relay during faults and load encroachment phenomenon, we must build a model of distance relay, so in this paper a modeling study of distance relay is implemented using MATLAB/Simulink program. However, this model is distinguished from previous models that, examines in detail the third zone of distance relay. Many cases are simulated with changing line loading and fault location to ensure the capability of the relay to detect the fault and thus the maximum load ability limit of distance relay is obtained. In order to prevent cascading events caused by hidden failures in zone-3 relays, agent based relay architectures have been suggested in the recent past. In such architectures each zone-3 relay contains agents that require communication with other agents at various relevant relays in order to distinguish a real zone-3 event from a temporary overload. In this paper, a local master agent is consulted by all zone-3 agents before a tripping decision is made. The master agent maintains a rule base which is updated based on the local topology of the network and real time monitoring of the status of other relays and circuit breakers. Cisco Packet Tracer program is used for running communication network simulations. The result of the simulation indicate that the time estimated to send and receive a packet data unit (PDU) message between one relay to anther can satisfy the communication requirement for the proposed scheme with fiber media.
OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Cascaded tripping of power lines due to mal-operation of zone-3 distance relays has been one of the main causes of many previous blackouts worldwide. Encroachment of load into zone-3 characteristics during stressed system operation conditions is a basic factor for such mal-operation of the relays. By improving the operation of zone-3, it is possible to prevent mal-operations so that cascaded line tripping can be avoided. For proper study of the behavior of distance relay during faults and load encroachment phenomenon, we must build a model of distance relay, so in this paper a modeling study of distance relay is implemented using MATLAB/Simulink program. However, this model is distinguished from previous models that, examines in detail the third zone of distance relay. Many cases are simulated with changing line loading and fault location to ensure the capability of the relay to detect the fault and thus the maximum load ability limit of distance relay is obtained. In order to prevent cascading events caused by hidden failures in zone-3 relays, agent based relay architectures have been suggested in the recent past. In such architectures each zone-3 relay contains agents that require communication with other agents at various relevant relays in order to distinguish a real zone-3 event from a temporary overload. In this paper, a local master agent is consulted by all zone-3 agents before a tripping decision is made. The master agent maintains a rule base which is updated based on the local topology of the network and real time monitoring of the status of other relays and circuit breakers. Cisco Packet Tracer program is used for running communication network simulations. The result of the simulation indicate that the time estimated to send and receive a packet data unit (PDU) message between one relay to anther can satisfy the communication requirement for the proposed scheme with fiber media.
Key concepts: Relay, Tripping, Protective relay, Fault (geology), Digital protective relay, MATLAB, Computer science, Line (geometry)