1991•Coastal SedimentsRequires access

Optimization of Maintenance for Coastal Inlets with Uncertainty

Jay R. Lund

Open publisher page 0 citations

Abstract

Maintenance dredging costs the nation roughly $400 million per year. Yet, relative to other areas of water resources engineering, little attempt has been made to apply operations research methods to reduce the cost or increase the reliability of maintenance dredging operations. This paper extends the results of a U.S. Army Corps of Engineers sponsored study to demonstrate a preliminary methodology for estimating the optimal dredging frequency for coastal inlets. The method incorporates both a stochastic model of sediment deposition from littoral drift and a dredging cost model to estimate both the long term annualized cost and navigation reliability of various maintenance strategies. The managers of the inlet can then choose a dredging or sand-bypass strategy representing the most appropriate trade-off of cost and reliability. The problem of employing the method with imperfect transport and sedimentation models is discussed.

About this research paper

What this paper is about

Maintenance dredging costs the nation roughly $400 million per year. Yet, relative to other areas of water resources engineering, little attempt has been made to apply operations research methods to reduce the cost or increase the reliability of maintenance dredging operations. This paper extends the results of a U.S. Army Corps of Engineers sponsored study to demonstrate a preliminary methodology for estimating the optimal dredging frequency for coastal inlets. The method incorporates both a stochastic model of sediment deposition from littoral drift and a dredging cost model to estimate both the long term annualized cost and navigation reliability of various maintenance strategies. The managers of the inlet can then choose a dredging or sand-bypass strategy representing the most appropriate trade-off of cost and reliability. The problem of employing the method with imperfect transport and sedimentation models is discussed.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Maintenance dredging costs the nation roughly $400 million per year. Yet, relative to other areas of water resources engineering, little attempt has been made to apply operations research methods to reduce the cost or increase the reliability of maintenance dredging operations. This paper extends the results of a U.S. Army Corps of Engineers sponsored study to demonstrate a preliminary methodology for estimating the optimal dredging frequency for coastal inlets. The method incorporates both a stochastic model of sediment deposition from littoral drift and a dredging cost model to estimate both the long term annualized cost and navigation reliability of various maintenance strategies. The managers of the inlet can then choose a dredging or sand-bypass strategy representing the most appropriate trade-off of cost and reliability. The problem of employing the method with imperfect transport and sedimentation models is discussed.

Key concepts: Dredging, Reliability (semiconductor), Inlet, Sedimentation, Marine engineering, Environmental science, Engineering, Operations research

Related papers

Back to paper searchBrowse research topicsOriginal source