The rubble foundation for the immersed tunnel under construction in the Bosphorus strait is build by using the tremie pipe and the grader equipment due to the large depth and strong currents in the strait. The rubble-dumping simulator to predict the height distribution of dumped rubble was developed in order to obtain the optimum rubble volume and positions for dumping. In the simulator, the dumped rubble distribution is estimated by two parameters, the dispersion coefficient and the angle of repose of the rubble.The field test for building the rubble foundation was performed at the construction site. The two parameters of the rubble were examined from the test. Then it was confirmed that the dumped rubble distribution was simulated well by the simulator. And it's succeeded to build the accurate rubble foundation under the sever sea state by the construction technique using the tremie pipe and the grader equipment.

Open-access reader

About this research paper

What this paper is about

The rubble foundation for the immersed tunnel under construction in the Bosphorus strait is build by using the tremie pipe and the grader equipment due to the large depth and strong currents in the strait. The rubble-dumping simulator to predict the height distribution of dumped rubble was developed in order to obtain the optimum rubble volume and positions for dumping. In the simulator, the dumped rubble distribution is estimated by two parameters, the dispersion coefficient and the angle of repose of the rubble.The field test for building the rubble foundation was performed at the construction site. The two parameters of the rubble were examined from the test. Then it was confirmed that the dumped rubble distribution was simulated well by the simulator. And it's succeeded to build the accurate rubble foundation under the sever sea state by the construction technique using the tremie pipe and the grader equipment.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The rubble foundation for the immersed tunnel under construction in the Bosphorus strait is build by using the tremie pipe and the grader equipment due to the large depth and strong currents in the strait. The rubble-dumping simulator to predict the height distribution of dumped rubble was developed in order to obtain the optimum rubble volume and positions for dumping. In the simulator, the dumped rubble distribution is estimated by two parameters, the dispersion coefficient and the angle of repose of the rubble.The field test for building the rubble foundation was performed at the construction site. The two parameters of the rubble were examined from the test. Then it was confirmed that the dumped rubble distribution was simulated well by the simulator. And it's succeeded to build the accurate rubble foundation under the sever sea state by the construction technique using the tremie pipe and the grader equipment.

Key concepts: Rubble, Foundation (evidence), Geotechnical engineering, Engineering, Geology, Geography, Archaeology

Related papers

Back to paper searchBrowse research topicsOriginal source
Untitled research work — Research Paper | ScholarLens