Industrial and Municipal Wastewater Treatment in the Sequencing Batch Reactor
J. Vrtovšek, Milenko Roš
Abstract
Open-access reader
J. Vrtovšek, Milenko Roš
Abstract
Open-access reader
A mixture of Industrial wastewater from chemical industry (varnish, paint and pigments production) and municipal wastewater was treated in pilot sequencing batch reactor (SBR).Results of the pilot experiments show that the foaming problem has great influence on the behavior of SBR, especially when the ratio between industrial and municipal wastewater is very high.Foaming problem was negligible when the mixture with j = 20 % of the industrial wastewater and j = 80 % of the municipal wastewater was treated.With the operational cycle of 6 h with anoxic (non-aerated) and aerobic (aerated) phase the required effluent quality was obtained according to regulations for treated wastewater that flows into the recipient.Operational cycle (aerobic phase) can be 60 min shorter at minimal organic and nitrogen loading.
OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
A mixture of Industrial wastewater from chemical industry (varnish, paint and pigments production) and municipal wastewater was treated in pilot sequencing batch reactor (SBR).Results of the pilot experiments show that the foaming problem has great influence on the behavior of SBR, especially when the ratio between industrial and municipal wastewater is very high.Foaming problem was negligible when the mixture with j = 20 % of the industrial wastewater and j = 80 % of the municipal wastewater was treated.With the operational cycle of 6 h with anoxic (non-aerated) and aerobic (aerated) phase the required effluent quality was obtained according to regulations for treated wastewater that flows into the recipient.Operational cycle (aerobic phase) can be 60 min shorter at minimal organic and nitrogen loading.
Key concepts: Wastewater, Aeration, Effluent, Industrial wastewater treatment, Sequencing batch reactor, Waste management, Environmental science, Anoxic waters