Assess the current status of the Railway track Case Study line Aleppo - Damascus
Ali Alsheikh
Abstract
Ali Alsheikh
Abstract
The Railway track is the main factor in evaluation any railway system, because it has direct effect on speed, comfort and safety of Train. As it costs about 35% of total construction of new railway, this research is important to study all elements and use available data to evaluate the studied line, and then it analyses the results to clarify the reaction between the defects. Therefore, the paper shows the priority of maintenance with less prices.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The Railway track is the main factor in evaluation any railway system, because it has direct effect on speed, comfort and safety of Train. As it costs about 35% of total construction of new railway, this research is important to study all elements and use available data to evaluate the studied line, and then it analyses the results to clarify the reaction between the defects. Therefore, the paper shows the priority of maintenance with less prices.
Key concepts: Track (disk drive), Railway system, Railway line, Transport engineering, Line (geometry), Engineering, Forensic engineering, Mechanical engineering