The C-ADS accelerator is a CW (Continuous-Wave) proton linac with 1.5 GeV in beam energy, 10 mA in beam current, and 15 MW in beam power. C-ADS Injector-I accelerator is a 10-mA 10-MeV CW proton linac, which uses a 3.2-MeV normal conducting 4-Vane RFQ and superconducting single-spoke cavities for accelerating. The frequency of RFQ accelerator is 325 MHz. The test stand composed of an ECR ion source, LEBT, RFQ, MEBT and beam dump have been installed and the first stage of beam commissioning have been finished at IHEP in 2014 mid-year. At 90% duty factor, we got 11 mA proton beam at RFQ exit with 90% beam transmission efficiency, while 95% beam transmission efficiency at 70% duty factor. The energy after RFQ was measured by TOF method with FCTs. The transverse emittance measured by double-slits emittance meter was 0.135 π mm-mrad, which of detailed data analysis will be presented in this paper.

About this research paper

What this paper is about

The C-ADS accelerator is a CW (Continuous-Wave) proton linac with 1.5 GeV in beam energy, 10 mA in beam current, and 15 MW in beam power. C-ADS Injector-I accelerator is a 10-mA 10-MeV CW proton linac, which uses a 3.2-MeV normal conducting 4-Vane RFQ and superconducting single-spoke cavities for accelerating. The frequency of RFQ accelerator is 325 MHz. The test stand composed of an ECR ion source, LEBT, RFQ, MEBT and beam dump have been installed and the first stage of beam commissioning have been finished at IHEP in 2014 mid-year. At 90% duty factor, we got 11 mA proton beam at RFQ exit with 90% beam transmission efficiency, while 95% beam transmission efficiency at 70% duty factor. The energy after RFQ was measured by TOF method with FCTs. The transverse emittance measured by double-slits emittance meter was 0.135 π mm-mrad, which of detailed data analysis will be presented in this paper.

Why it matters

OpenAlex reports 4 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The C-ADS accelerator is a CW (Continuous-Wave) proton linac with 1.5 GeV in beam energy, 10 mA in beam current, and 15 MW in beam power. C-ADS Injector-I accelerator is a 10-mA 10-MeV CW proton linac, which uses a 3.2-MeV normal conducting 4-Vane RFQ and superconducting single-spoke cavities for accelerating. The frequency of RFQ accelerator is 325 MHz. The test stand composed of an ECR ion source, LEBT, RFQ, MEBT and beam dump have been installed and the first stage of beam commissioning have been finished at IHEP in 2014 mid-year. At 90% duty factor, we got 11 mA proton beam at RFQ exit with 90% beam transmission efficiency, while 95% beam transmission efficiency at 70% duty factor. The energy after RFQ was measured by TOF method with FCTs. The transverse emittance measured by double-slits emittance meter was 0.135 π mm-mrad, which of detailed data analysis will be presented in this paper.

Key concepts: Injector, Beam (structure), Project commissioning, Physics, Engineering, Nuclear engineering, Mechanical engineering, Structural engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Beam Commissioning of C-ADS Injector-I RFQ Accelerator — Research Paper | ScholarLens