Control System Status of SuperKEKB Injector Linac

Masanori Satoh, Enomoto, Yoshinori, K. Furukawa, Hisazumi, Keiichi, Takuya Kudou, Kuroda, Yusuke, Kusano, Shiro, F. Miyahara, Yoshikazu Mizukawa, Natsui, Takuya, Ohfusa, Takuya, Saotome, Hideki, Satake, Itsuka, Yuji Seimiya, Sugimura, Hitoshi, T. Suwada, Makoto Takagi, Ushimoto, Shinji

Open full text 0 citations

Abstract

The Phase I beam commissioning of SuperKEKB has been conducted from February to June in the last year. The injector linac has successfully delivered the electron and positron beams to the SuperKEKB main ring. The linac beam studies and subsystem developments are also intensively going on together with the daily normal beam injection to both rings of the SuperKEKB and two light sources. Towards Phase II and III beam commissioning of SuperKEKB, one of key issues is a fine beam control with the new beam position monitor readout system, a positron capture system based on the flux concentrator, a pulsed quadrupole and steering magnets, and a low emittance photo-cathode rf electron source. In this paper, we report the control system status of SuperKEKB injector linac together with the commissioning result of Phase I. In addition, the improvement plant of injector control system is also mentioned.

Open-access reader

About this research paper

What this paper is about

The Phase I beam commissioning of SuperKEKB has been conducted from February to June in the last year. The injector linac has successfully delivered the electron and positron beams to the SuperKEKB main ring. The linac beam studies and subsystem developments are also intensively going on together with the daily normal beam injection to both rings of the SuperKEKB and two light sources. Towards Phase II and III beam commissioning of SuperKEKB, one of key issues is a fine beam control with the new beam position monitor readout system, a positron capture system based on the flux concentrator, a pulsed quadrupole and steering magnets, and a low emittance photo-cathode rf electron source. In this paper, we report the control system status of SuperKEKB injector linac together with the commissioning result of Phase I. In addition, the improvement plant of injector control system is also mentioned.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The Phase I beam commissioning of SuperKEKB has been conducted from February to June in the last year. The injector linac has successfully delivered the electron and positron beams to the SuperKEKB main ring. The linac beam studies and subsystem developments are also intensively going on together with the daily normal beam injection to both rings of the SuperKEKB and two light sources. Towards Phase II and III beam commissioning of SuperKEKB, one of key issues is a fine beam control with the new beam position monitor readout system, a positron capture system based on the flux concentrator, a pulsed quadrupole and steering magnets, and a low emittance photo-cathode rf electron source. In this paper, we report the control system status of SuperKEKB injector linac together with the commissioning result of Phase I. In addition, the improvement plant of injector control system is also mentioned.

Key concepts: Linear particle accelerator, Injector, Environmental science, Engineering, Physics, Beam (structure), Optics, Mechanical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Control System Status of SuperKEKB Injector Linac — Research Paper | ScholarLens