Control System Upgrade for SuperKEKB Injector Linac
Masanori Satoh, K. Furukawa, Takuya Kudou, Shiro Kusano, K. Mikawa, F. Miyahara, Saotome, Hideki, Yuji Seimiya, T. Suwada, Makoto Takagi
Abstract
Masanori Satoh, K. Furukawa, Takuya Kudou, Shiro Kusano, K. Mikawa, F. Miyahara, Saotome, Hideki, Yuji Seimiya, T. Suwada, Makoto Takagi
Abstract
Toward SuperKEKB project, the electron/positron injector linac upgrade is ongoing at KEK in order to deliver the low emittance electron/positron beams with high bunched charge intensity and small emittance. A large number of accelerator components and control devices will be newly installed before the autumn of 2014. Finally, we are aiming at the simultaneous top-up operation for the four independent storage rings including two light sources. The high availability and reliability of control system is strongly required for the long-term stable beam operation under such complex operation schemes. In this presentation, we will describe the control system upgrade plan and status.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Toward SuperKEKB project, the electron/positron injector linac upgrade is ongoing at KEK in order to deliver the low emittance electron/positron beams with high bunched charge intensity and small emittance. A large number of accelerator components and control devices will be newly installed before the autumn of 2014. Finally, we are aiming at the simultaneous top-up operation for the four independent storage rings including two light sources. The high availability and reliability of control system is strongly required for the long-term stable beam operation under such complex operation schemes. In this presentation, we will describe the control system upgrade plan and status.
Key concepts: Linear particle accelerator, Upgrade, Thermal emittance, Injector, KEKB, Physics, Beam (structure), Storage ring