Beam Commissioning Results for the CSNS MEBT and DTL-1
Jun Peng, Yuwen An, Shinian Fu, Liangsheng Huang, Ming-Yang Huang, Mingtao Li, Yong Li, Zhiping Li, Yudong Liu, Xiaohan Lu, Sheng Wang, Shou Xu, Yue Yuan
Abstract
Jun Peng, Yuwen An, Shinian Fu, Liangsheng Huang, Ming-Yang Huang, Mingtao Li, Yong Li, Zhiping Li, Yudong Liu, Xiaohan Lu, Sheng Wang, Shou Xu, Yue Yuan
Abstract
The China Spallation Neutron Source (CSNS) is designed to deliver a 1.6GeV proton beam to a solid metal target for neutron scattering research. It will be constructed in two phases. In the 1st phase, the beam power is designed to be 100kW. In the 2nd phase, the beam power will be upgraded to 500kW by doubling the linac output energy and beam current. The accelerator complex consists of a 50keV H⁻ ion source, a 3MeV Radio Frequency Quadrupole (RFQ), a 80MeV Drift tube Linac (DTL), and a 1.6GeV rapid-cycling synchrotron (RCS). Until March 2016, the front end and the first tank of DTL have been fully commissioned. The primary design goals of peak current, transverse emittance and beam energy have been achieved. This paper reports on the methods and the results of the commissioning.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The China Spallation Neutron Source (CSNS) is designed to deliver a 1.6GeV proton beam to a solid metal target for neutron scattering research. It will be constructed in two phases. In the 1st phase, the beam power is designed to be 100kW. In the 2nd phase, the beam power will be upgraded to 500kW by doubling the linac output energy and beam current. The accelerator complex consists of a 50keV H⁻ ion source, a 3MeV Radio Frequency Quadrupole (RFQ), a 80MeV Drift tube Linac (DTL), and a 1.6GeV rapid-cycling synchrotron (RCS). Until March 2016, the front end and the first tank of DTL have been fully commissioned. The primary design goals of peak current, transverse emittance and beam energy have been achieved. This paper reports on the methods and the results of the commissioning.
Key concepts: Computer science, Physics