2016JACOWOpen access

Status of the First CH-Cavities for the New Superconducting CW Heavy Ion LINAC@GSI

Markus Basten, Michael Amberg, Kurt Aulenbacher, W. Barth, M. Busch, Florian Dziuba, Viktor Gettmann, Manuel Heilmann, Sascha Mickat, M. Miski-Oglu, Holger Podlech, Schwarz, Malte, Stepan Yaramyshev

Open full text 2 citations

Abstract

In the field of Super Heavy Elements (SHE) a superconducting (sc) continuous wave (cw) high intensity heavy ion LINAC is highly desirable. Currently a multi-stage R&D program conducted by GSI, HIM and IAP* is in progress. The baseline linac design composes a high performance ion source, a new low energy beam transport line, a (cw) upgraded High Charge State Injector (HLI), and a matching line (1.4 MeV/u) followed by the new sc-DTL LINAC for acceleration up to 7.3 MeV/u. The commissioning of the first CH cavity (Demonstrator), in a horizontal cryo module with beam is a major milestone in 2016**. The advanced demonstrator comprises constant-beta sc Crossbar-H-mode (CH) cavities operated at 217 MHz. Presently, the first two sc CH cavities of the advanced demonstrator are under construction at Research Instruments (RI), Bergisch Gladbach, Germany. A string of cavities and focusing elements build from several short CH-cavities with 8 gaps, without girders is recommended. The new design potentially reduces the overall technical risks during the fabrication and the pressure sensitivity through stiffening brackets. The present status of the first two sc cavities will be presented.

About this research paper

What this paper is about

In the field of Super Heavy Elements (SHE) a superconducting (sc) continuous wave (cw) high intensity heavy ion LINAC is highly desirable. Currently a multi-stage R&D program conducted by GSI, HIM and IAP* is in progress. The baseline linac design composes a high performance ion source, a new low energy beam transport line, a (cw) upgraded High Charge State Injector (HLI), and a matching line (1.4 MeV/u) followed by the new sc-DTL LINAC for acceleration up to 7.3 MeV/u. The commissioning of the first CH cavity (Demonstrator), in a horizontal cryo module with beam is a major milestone in 2016**. The advanced demonstrator comprises constant-beta sc Crossbar-H-mode (CH) cavities operated at 217 MHz. Presently, the first two sc CH cavities of the advanced demonstrator are under construction at Research Instruments (RI), Bergisch Gladbach, Germany. A string of cavities and focusing elements build from several short CH-cavities with 8 gaps, without girders is recommended. The new design potentially reduces the overall technical risks during the fabrication and the pressure sensitivity through stiffening brackets. The present status of the first two sc cavities will be presented.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In the field of Super Heavy Elements (SHE) a superconducting (sc) continuous wave (cw) high intensity heavy ion LINAC is highly desirable. Currently a multi-stage R&D program conducted by GSI, HIM and IAP* is in progress. The baseline linac design composes a high performance ion source, a new low energy beam transport line, a (cw) upgraded High Charge State Injector (HLI), and a matching line (1.4 MeV/u) followed by the new sc-DTL LINAC for acceleration up to 7.3 MeV/u. The commissioning of the first CH cavity (Demonstrator), in a horizontal cryo module with beam is a major milestone in 2016**. The advanced demonstrator comprises constant-beta sc Crossbar-H-mode (CH) cavities operated at 217 MHz. Presently, the first two sc CH cavities of the advanced demonstrator are under construction at Research Instruments (RI), Bergisch Gladbach, Germany. A string of cavities and focusing elements build from several short CH-cavities with 8 gaps, without girders is recommended. The new design potentially reduces the overall technical risks during the fabrication and the pressure sensitivity through stiffening brackets. The present status of the first two sc cavities will be presented.

Key concepts: Linear particle accelerator, Heavy ion, Physics, Nuclear physics, Superconductivity, Ion, Optics, Condensed matter physics

Related papers

Back to paper searchBrowse research topicsOriginal source
Status of the First CH-Cavities for the New Superconducting CW Heavy Ion LINAC@GSI — Research Paper | ScholarLens