BWR Fuel-Bundle Extended-Burnup Program: end of Cycle 7 fuel-bundle examination at Monticello Nuclear Generation Plant

J.A. Habermeyer, S.Y. Ogawa, J.R. Ingvoldstad

Open publisher page 0 citations

Abstract

This report describes the work performed, data obtained and visual observations made during the first examination of high burnup fuel bundles as part of a joint United States Department of Energy (DOE), General Electric Company (GE), Northern States Power company (NSP) BWR Fuel Bundle Extended Burnup Program. Four 8 x 8 reload fuel bundles which had been operating at the Monticello Nuclear Generating Plant since the beginning of cycle 3 had each attained an average burnup of 33,800 MWd/MTU. Three of the fuel bundles were examined during the reactor refueling outage at the end of cycle 7. The fourth bundle was discharged and examined after the refueling outage, including the removal of three spacers, the water rod and twelve fuel rods for subsequent hot cell examination.

About this research paper

What this paper is about

This report describes the work performed, data obtained and visual observations made during the first examination of high burnup fuel bundles as part of a joint United States Department of Energy (DOE), General Electric Company (GE), Northern States Power company (NSP) BWR Fuel Bundle Extended Burnup Program. Four 8 x 8 reload fuel bundles which had been operating at the Monticello Nuclear Generating Plant since the beginning of cycle 3 had each attained an average burnup of 33,800 MWd/MTU. Three of the fuel bundles were examined during the reactor refueling outage at the end of cycle 7. The fourth bundle was discharged and examined after the refueling outage, including the removal of three spacers, the water rod and twelve fuel rods for subsequent hot cell examination.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This report describes the work performed, data obtained and visual observations made during the first examination of high burnup fuel bundles as part of a joint United States Department of Energy (DOE), General Electric Company (GE), Northern States Power company (NSP) BWR Fuel Bundle Extended Burnup Program. Four 8 x 8 reload fuel bundles which had been operating at the Monticello Nuclear Generating Plant since the beginning of cycle 3 had each attained an average burnup of 33,800 MWd/MTU. Three of the fuel bundles were examined during the reactor refueling outage at the end of cycle 7. The fourth bundle was discharged and examined after the refueling outage, including the removal of three spacers, the water rod and twelve fuel rods for subsequent hot cell examination.

Key concepts: Burnup, Bundle, Nuclear engineering, Nuclear fuel cycle, Rod, Nuclear power plant, Environmental science, Spent fuel pool

Related papers

Back to paper searchBrowse research topicsOriginal source
BWR Fuel-Bundle Extended-Burnup Program: end of Cycle 7 fuel-bundle examination at Monticello Nuclear Generation Plant — Research Paper | ScholarLens