Environmental and social impact assessment for Dong Hoi city sub-project
Tuyet Thi Phung
Abstract
Tuyet Thi Phung
Abstract
The development objective of Coastal Cities Sustainable Environment Project for Vietnam is to renovate rain-water drainage system of the city centre to drain rain-water and control flood. Some of the negative impacts and mitigation measures include: (i) inform the school management of the construction activities and their potential impacts such, waste, dust, and noise, traffic, and construction schedule at least one month before start of the construction; (ii) deploy staff to guide the traffic during construction during transportation, loading and unloading of construction materials and wastes; (iii) provide night lighting system with luminously painted fence and night lamp (7pm to 6am); (iv) ensure a drainage ditch at the site and clean any clogs; (v) spray sufficient water to suppress dust during dry and windy days at least three times a day at site; (vi) cover the incomplete trenches under construction at day’s end; (vii) set up construction and traffic warning signs at the construction site; (viii) pay attention to railway warning signs while crossing the railway; and (ix) periodically registry and supervise the quality of transport vehicles as required by the government regulations.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The development objective of Coastal Cities Sustainable Environment Project for Vietnam is to renovate rain-water drainage system of the city centre to drain rain-water and control flood. Some of the negative impacts and mitigation measures include: (i) inform the school management of the construction activities and their potential impacts such, waste, dust, and noise, traffic, and construction schedule at least one month before start of the construction; (ii) deploy staff to guide the traffic during construction during transportation, loading and unloading of construction materials and wastes; (iii) provide night lighting system with luminously painted fence and night lamp (7pm to 6am); (iv) ensure a drainage ditch at the site and clean any clogs; (v) spray sufficient water to suppress dust during dry and windy days at least three times a day at site; (vi) cover the incomplete trenches under construction at day’s end; (vii) set up construction and traffic warning signs at the construction site; (viii) pay attention to railway warning signs while crossing the railway; and (ix) periodically registry and supervise the quality of transport vehicles as required by the government regulations.
Key concepts: Drainage, Ditch, Environmental science, Fence (mathematics), Warning system, Flood myth, Training (meteorology), Schedule