2016•Asia Pacific Journal of Operational ResearchRequires access

Single Machine Two-Agent Scheduling with Deteriorating Jobs

Zhenyou Wang, Cai-Min Wei, Yu-Bin Wu

Open publisher page 8 citations

Abstract

This paper deals with the single machine scheduling problem with deteriorating jobs in which there are two distinct families of jobs (i.e., two-agent) pursuing different objectives. In this model the processing time of a job is defined as a function that is proportional to a linear function of its stating time. For the following three scheduling criteria: minimizing the makespan, minimizing the total weighted completion time, and minimizing the maximum lateness, we show that some basic versions of the problem are polynomially solvable. We also establish the conditions under which the problem is computationally hard.

About this research paper

What this paper is about

This paper deals with the single machine scheduling problem with deteriorating jobs in which there are two distinct families of jobs (i.e., two-agent) pursuing different objectives. In this model the processing time of a job is defined as a function that is proportional to a linear function of its stating time. For the following three scheduling criteria: minimizing the makespan, minimizing the total weighted completion time, and minimizing the maximum lateness, we show that some basic versions of the problem are polynomially solvable. We also establish the conditions under which the problem is computationally hard.

Why it matters

OpenAlex reports 8 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This paper deals with the single machine scheduling problem with deteriorating jobs in which there are two distinct families of jobs (i.e., two-agent) pursuing different objectives. In this model the processing time of a job is defined as a function that is proportional to a linear function of its stating time. For the following three scheduling criteria: minimizing the makespan, minimizing the total weighted completion time, and minimizing the maximum lateness, we show that some basic versions of the problem are polynomially solvable. We also establish the conditions under which the problem is computationally hard.

Key concepts: Job shop scheduling, Single-machine scheduling, Scheduling (production processes), Mathematical optimization, Computer science, Due date, Mathematics, Schedule

Related papers

Back to paper searchBrowse research topicsOriginal source
Single Machine Two-Agent Scheduling with Deteriorating Jobs — Research Paper | ScholarLens