Status of SPIRAL2 and RFQ Beam Commissioning

R. Ferdinand, Patrick C. Bertrand, Jean-Luc Biarrotte, Marco Di Giacomo, H. Frånberg, O. Kamalou, Jean-Michel Lagniel, Guillaume Normand, Alain Savalle, D. Uriot, Franck Varenne

Open full text 4 citations

Abstract

The SPIRAL2 project beam commissioning is started and the superconducting linac installation is being finalized. In parallel with the installations, the first proton beam was extracted in 2014 and the expected beam performances were achieved from both light and heavy ion sources. The conditioning of the RFQ started in October 2015, and the beam commissioning soon after that. After having briefly recalled the project scope and parameters, the present situation of the RFQ beam commissioning is presented.

About this research paper

What this paper is about

The SPIRAL2 project beam commissioning is started and the superconducting linac installation is being finalized. In parallel with the installations, the first proton beam was extracted in 2014 and the expected beam performances were achieved from both light and heavy ion sources. The conditioning of the RFQ started in October 2015, and the beam commissioning soon after that. After having briefly recalled the project scope and parameters, the present situation of the RFQ beam commissioning is presented.

Why it matters

OpenAlex reports 4 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The SPIRAL2 project beam commissioning is started and the superconducting linac installation is being finalized. In parallel with the installations, the first proton beam was extracted in 2014 and the expected beam performances were achieved from both light and heavy ion sources. The conditioning of the RFQ started in October 2015, and the beam commissioning soon after that. After having briefly recalled the project scope and parameters, the present situation of the RFQ beam commissioning is presented.

Key concepts: Project commissioning, Beam (structure), Computer science, Physics, Optics, Political science, Publishing, Law

Related papers

Back to paper searchBrowse research topicsOriginal source
Status of SPIRAL2 and RFQ Beam Commissioning — Research Paper | ScholarLens