2016Journal of Physics Conference SeriesOpen access

An integrated production-inventory model for the singlevendor two-buyer problem with partial backorder, stochastic demand, and service level constraints

Nughthoh Arfawi Kurdhi, Toray Adi Diwiryo, Sutanto Sutanto

Open full text 3 citations

Abstract

This paper presents an integrated single-vendor two-buyer production-inventory model with stochastic demand and service level constraints. Shortage is permitted in the model, and partial backordered partial lost sale. The lead time demand is assumed follows a normal distribution and the lead time can be reduced by adding crashing cost. The lead time and ordering cost reductions are interdependent with logaritmic function relationship. A service level constraint policy corresponding to each buyer is considered in the model in order to limit the level of inventory shortages. The purpose of this research is to minimize joint total cost inventory model by finding the optimal order quantity, safety stock, lead time, and the number of lots delivered in one production run. The optimal production-inventory policy gained by the Lagrange method is shaped to account for the service level restrictions. Finally, a numerical example and effects of the key parameters are performed to illustrate the results of the proposed model.

Open-access reader

About this research paper

What this paper is about

This paper presents an integrated single-vendor two-buyer production-inventory model with stochastic demand and service level constraints. Shortage is permitted in the model, and partial backordered partial lost sale. The lead time demand is assumed follows a normal distribution and the lead time can be reduced by adding crashing cost. The lead time and ordering cost reductions are interdependent with logaritmic function relationship. A service level constraint policy corresponding to each buyer is considered in the model in order to limit the level of inventory shortages. The purpose of this research is to minimize joint total cost inventory model by finding the optimal order quantity, safety stock, lead time, and the number of lots delivered in one production run. The optimal production-inventory policy gained by the Lagrange method is shaped to account for the service level restrictions. Finally, a numerical example and effects of the key parameters are performed to illustrate the results of the proposed model.

Why it matters

OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This paper presents an integrated single-vendor two-buyer production-inventory model with stochastic demand and service level constraints. Shortage is permitted in the model, and partial backordered partial lost sale. The lead time demand is assumed follows a normal distribution and the lead time can be reduced by adding crashing cost. The lead time and ordering cost reductions are interdependent with logaritmic function relationship. A service level constraint policy corresponding to each buyer is considered in the model in order to limit the level of inventory shortages. The purpose of this research is to minimize joint total cost inventory model by finding the optimal order quantity, safety stock, lead time, and the number of lots delivered in one production run. The optimal production-inventory policy gained by the Lagrange method is shaped to account for the service level restrictions. Finally, a numerical example and effects of the key parameters are performed to illustrate the results of the proposed model.

Key concepts: Lead time, Service level, Safety stock, Production (economics), Vendor, Economic shortage, Operations research, Lagrange multiplier

Related papers

Back to paper searchBrowse research topicsOriginal source
An integrated production-inventory model for the singlevendor two-buyer problem with partial backorder, stochastic demand, and service level constraints — Research Paper | ScholarLens