Guidelines for LCC analysis and evaluation of public construction projects in Korea

T.K. Kang Y.S. Lee

Open publisher page 0 citations

Abstract

In order to forecast accurate Life Cycle Cost(LCC), various difficult problems should be solved. For example, since there are some areas such as geological conditions that can not be perfectly estimated in advance, while judging only from the initial construction cost, it is a general practice, in many cases, to increase/reduce the construction cost through design change after the contract conclusion. If accurate advance forecasting of even the construction cost only would be difficult while the construction period of building the facilities holds only a very short period of time among the total life cycle, it could be assumed without difficulties that LCC involving the whole life cycle would be affected by more complicated and diversified uncertain factors.

About this research paper

What this paper is about

In order to forecast accurate Life Cycle Cost(LCC), various difficult problems should be solved. For example, since there are some areas such as geological conditions that can not be perfectly estimated in advance, while judging only from the initial construction cost, it is a general practice, in many cases, to increase/reduce the construction cost through design change after the contract conclusion. If accurate advance forecasting of even the construction cost only would be difficult while the construction period of building the facilities holds only a very short period of time among the total life cycle, it could be assumed without difficulties that LCC involving the whole life cycle would be affected by more complicated and diversified uncertain factors.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In order to forecast accurate Life Cycle Cost(LCC), various difficult problems should be solved. For example, since there are some areas such as geological conditions that can not be perfectly estimated in advance, while judging only from the initial construction cost, it is a general practice, in many cases, to increase/reduce the construction cost through design change after the contract conclusion. If accurate advance forecasting of even the construction cost only would be difficult while the construction period of building the facilities holds only a very short period of time among the total life cycle, it could be assumed without difficulties that LCC involving the whole life cycle would be affected by more complicated and diversified uncertain factors.

Key concepts: Construction engineering, Business, Engineering, Architectural engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Guidelines for LCC analysis and evaluation of public construction projects in Korea — Research Paper | ScholarLens