Feasibility of Wind Power and Photovoltaics Replacing Nuclear Power

Hsiao Tzu-Hsun

Open full text 0 citations

Abstract

The paper studies the feasibility of using renewable energy (specifically wind power and photovoltaics) to replace nuclear power in terms of area acquisition, grid scheduling, and overall cost and benefit. The development of renewable energy in Taiwan is restricted by area availability. Assuming a power generation capacity of four nuclear power plants, the analysis finds that wind and photovoltaic (PV) power would respectively require about 33.7 and 88.5 times the area required for the nuclear power plants. The paper also studies operating reserve requirements to prevent power outages resulting from unexpected changes of wind or PV output, finding that at least 2 gas-fired power plants with the level of Da-tam power storage plant are required at a cost of about NT$565.5 billion. Furthermore, based on the scenario of My 2050 L-4 with a more active program, wind power and PVs replacement of nuclear power would only become feasible in 2035 and require a total investment of NT$2,590 billion, equivalent to about 9 times of construction costs of Taiwan’s 4th nuclear power plant. Renewable energy is intermittent and unsteady and, as large-scale renewable energy is increasingly integrated into the power grid, providing a stable electricity supply will be acritical consideration in determining the future role of nuclear power in Taiwan.

Open-access reader

About this research paper

What this paper is about

The paper studies the feasibility of using renewable energy (specifically wind power and photovoltaics) to replace nuclear power in terms of area acquisition, grid scheduling, and overall cost and benefit. The development of renewable energy in Taiwan is restricted by area availability. Assuming a power generation capacity of four nuclear power plants, the analysis finds that wind and photovoltaic (PV) power would respectively require about 33.7 and 88.5 times the area required for the nuclear power plants. The paper also studies operating reserve requirements to prevent power outages resulting from unexpected changes of wind or PV output, finding that at least 2 gas-fired power plants with the level of Da-tam power storage plant are required at a cost of about NT$565.5 billion. Furthermore, based on the scenario of My 2050 L-4 with a more active program, wind power and PVs replacement of nuclear power would only become feasible in 2035 and require a total investment of NT$2,590 billion, equivalent to about 9 times of construction costs of Taiwan’s 4th nuclear power plant. Renewable energy is intermittent and unsteady and, as large-scale renewable energy is increasingly integrated into the power grid, providing a stable electricity supply will be acritical consideration in determining the future role of nuclear power in Taiwan.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The paper studies the feasibility of using renewable energy (specifically wind power and photovoltaics) to replace nuclear power in terms of area acquisition, grid scheduling, and overall cost and benefit. The development of renewable energy in Taiwan is restricted by area availability. Assuming a power generation capacity of four nuclear power plants, the analysis finds that wind and photovoltaic (PV) power would respectively require about 33.7 and 88.5 times the area required for the nuclear power plants. The paper also studies operating reserve requirements to prevent power outages resulting from unexpected changes of wind or PV output, finding that at least 2 gas-fired power plants with the level of Da-tam power storage plant are required at a cost of about NT$565.5 billion. Furthermore, based on the scenario of My 2050 L-4 with a more active program, wind power and PVs replacement of nuclear power would only become feasible in 2035 and require a total investment of NT$2,590 billion, equivalent to about 9 times of construction costs of Taiwan’s 4th nuclear power plant. Renewable energy is intermittent and unsteady and, as large-scale renewable energy is increasingly integrated into the power grid, providing a stable electricity supply will be acritical consideration in determining the future role of nuclear power in Taiwan.

Key concepts: Photovoltaics, Wind power, Nuclear power, Environmental science, Power (physics), Nuclear engineering, Photovoltaic system, Engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Feasibility of Wind Power and Photovoltaics Replacing Nuclear Power — Research Paper | ScholarLens