2004Water Science & TechnologyRequires access

Nitrite accumulation followed by denitrification using sequencing batch reactor

Chai Sung Gee, J.S. Kim

Open publisher page 23 citations

Abstract

Biological ammonia-nitrogen removal utilizes two distinct processes, nitrification and denitrification. In nitrification, ammonia oxidizes to nitrite then to nitrate. In this study, elimination of nitrite oxidation to nitrate step was attempted in order to directly remove nitrite to nitrogen gas by denitrification. For this study the supernatant from an anaerobic digester was used as an ammonia source and a sequencing batch reactor (SBR) was employed. Emphasis was given to the evaluation of the operational factors affecting nitrite accumulation and the elucidation of kinetics for biological nitrification and denitrification. Accumulation of nitrite in the nitrification process was achieved by suppressing the growth of Nitrobacter, a nitrite oxidizer, by loading high concentration ammonia supernatant immediately after all ammonia in the previous loading was oxidized to nitrite. Nitrite oxidation was taking place as the solid retention time (SRT) was increased from 2.5 days to 3.0 days in a continuously aerated SBR mode with daily feeding. However, nitrite accumulation was achieved even at longer SRT of 5 days when the aeration and non-aeration periods were appropriately combined and the non-aeration period can be used for denitrification of the accumulated nitrite with a carbon source supplied.

About this research paper

What this paper is about

Biological ammonia-nitrogen removal utilizes two distinct processes, nitrification and denitrification. In nitrification, ammonia oxidizes to nitrite then to nitrate. In this study, elimination of nitrite oxidation to nitrate step was attempted in order to directly remove nitrite to nitrogen gas by denitrification. For this study the supernatant from an anaerobic digester was used as an ammonia source and a sequencing batch reactor (SBR) was employed. Emphasis was given to the evaluation of the operational factors affecting nitrite accumulation and the elucidation of kinetics for biological nitrification and denitrification. Accumulation of nitrite in the nitrification process was achieved by suppressing the growth of Nitrobacter, a nitrite oxidizer, by loading high concentration ammonia supernatant immediately after all ammonia in the previous loading was oxidized to nitrite. Nitrite oxidation was taking place as the solid retention time (SRT) was increased from 2.5 days to 3.0 days in a continuously aerated SBR mode with daily feeding. However, nitrite accumulation was achieved even at longer SRT of 5 days when the aeration and non-aeration periods were appropriately combined and the non-aeration period can be used for denitrification of the accumulated nitrite with a carbon source supplied.

Why it matters

OpenAlex reports 23 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Biological ammonia-nitrogen removal utilizes two distinct processes, nitrification and denitrification. In nitrification, ammonia oxidizes to nitrite then to nitrate. In this study, elimination of nitrite oxidation to nitrate step was attempted in order to directly remove nitrite to nitrogen gas by denitrification. For this study the supernatant from an anaerobic digester was used as an ammonia source and a sequencing batch reactor (SBR) was employed. Emphasis was given to the evaluation of the operational factors affecting nitrite accumulation and the elucidation of kinetics for biological nitrification and denitrification. Accumulation of nitrite in the nitrification process was achieved by suppressing the growth of Nitrobacter, a nitrite oxidizer, by loading high concentration ammonia supernatant immediately after all ammonia in the previous loading was oxidized to nitrite. Nitrite oxidation was taking place as the solid retention time (SRT) was increased from 2.5 days to 3.0 days in a continuously aerated SBR mode with daily feeding. However, nitrite accumulation was achieved even at longer SRT of 5 days when the aeration and non-aeration periods were appropriately combined and the non-aeration period can be used for denitrification of the accumulated nitrite with a carbon source supplied.

Key concepts: Nitrite, Nitrate, Chemistry, Nitrification, Denitrification, Aeration, Ammonia, Sequencing batch reactor

Related papers

Back to paper searchBrowse research topicsOriginal source
Nitrite accumulation followed by denitrification using sequencing batch reactor — Research Paper | ScholarLens