2016IEEE Vehicular Technology MagazineRequires access

The Downtown Line of the Singapore Metro [Transportation Systems]

Harvey Glickenstein

Open publisher page 1 citations

Abstract

On Sunday 26 December 2015, Prime Minister Lee Hsien Loong officially opened stage 2 of the Downtown Line of the Singapore Metro. The Downtown Line is the fifth line of the Singapore Metro network. Built in different phases, the first phase of the line was inaugurated in December 2013. It is now 13-mi long and includes 18 stations. The third phase, which is currently under construction, will add 13 mi and 16 stations. The Downtown Metro Line-which will be the longest driverless underground line in Singapore-is expected to carry up to a half-million passengers per day.

About this research paper

What this paper is about

On Sunday 26 December 2015, Prime Minister Lee Hsien Loong officially opened stage 2 of the Downtown Line of the Singapore Metro. The Downtown Line is the fifth line of the Singapore Metro network. Built in different phases, the first phase of the line was inaugurated in December 2013. It is now 13-mi long and includes 18 stations. The third phase, which is currently under construction, will add 13 mi and 16 stations. The Downtown Metro Line-which will be the longest driverless underground line in Singapore-is expected to carry up to a half-million passengers per day.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

On Sunday 26 December 2015, Prime Minister Lee Hsien Loong officially opened stage 2 of the Downtown Line of the Singapore Metro. The Downtown Line is the fifth line of the Singapore Metro network. Built in different phases, the first phase of the line was inaugurated in December 2013. It is now 13-mi long and includes 18 stations. The third phase, which is currently under construction, will add 13 mi and 16 stations. The Downtown Metro Line-which will be the longest driverless underground line in Singapore-is expected to carry up to a half-million passengers per day.

Key concepts: Downtown, Line (geometry), Transport engineering, Engineering, Telecommunications, Geography, Archaeology, Geometry

Related papers

Back to paper searchBrowse research topicsOriginal source
The Downtown Line of the Singapore Metro [Transportation Systems] — Research Paper | ScholarLens