2002Tunnels & tunnellingRequires access

POWERING UNDER LONDON

Tris Thomas

Open publisher page 1 citations

Abstract

Three Lovat TBMs have been digging a 20-km course beneath the northern suburbs of London for the past year. The tunnel is the London Connection Project, which will carry electricity between two substations with a 400 kV cable, which will ramp up capacity to meet growing electrical demand. The tunnel is designed to have capacity for a second electrical cable within 10 to 15 years. Overhead power lines were dismissed for the heavily residential area, and digging up the roads in the region was considered too disruptive. The project is divided into three segments with six shafts. It passes through seven different formations. Tunneling began in September 2001. The contractor used a larger ring than usual, 1200 mm, to increase the daily advance, which has resulted in 20% higher production rates and suits the long travel times between the shaft and face in this project. The tunneling is nearing completion, which will leave the contractor the job of fitting out the shaft, completing the shaft headhouse buildings and other mechanical and electrical elements. It should be handed over to the utility by end of summer 2003.

About this research paper

What this paper is about

Three Lovat TBMs have been digging a 20-km course beneath the northern suburbs of London for the past year. The tunnel is the London Connection Project, which will carry electricity between two substations with a 400 kV cable, which will ramp up capacity to meet growing electrical demand. The tunnel is designed to have capacity for a second electrical cable within 10 to 15 years. Overhead power lines were dismissed for the heavily residential area, and digging up the roads in the region was considered too disruptive. The project is divided into three segments with six shafts. It passes through seven different formations. Tunneling began in September 2001. The contractor used a larger ring than usual, 1200 mm, to increase the daily advance, which has resulted in 20% higher production rates and suits the long travel times between the shaft and face in this project. The tunneling is nearing completion, which will leave the contractor the job of fitting out the shaft, completing the shaft headhouse buildings and other mechanical and electrical elements. It should be handed over to the utility by end of summer 2003.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Three Lovat TBMs have been digging a 20-km course beneath the northern suburbs of London for the past year. The tunnel is the London Connection Project, which will carry electricity between two substations with a 400 kV cable, which will ramp up capacity to meet growing electrical demand. The tunnel is designed to have capacity for a second electrical cable within 10 to 15 years. Overhead power lines were dismissed for the heavily residential area, and digging up the roads in the region was considered too disruptive. The project is divided into three segments with six shafts. It passes through seven different formations. Tunneling began in September 2001. The contractor used a larger ring than usual, 1200 mm, to increase the daily advance, which has resulted in 20% higher production rates and suits the long travel times between the shaft and face in this project. The tunneling is nearing completion, which will leave the contractor the job of fitting out the shaft, completing the shaft headhouse buildings and other mechanical and electrical elements. It should be handed over to the utility by end of summer 2003.

Key concepts: Digging, Engineering, Electricity, Overhead (engineering), Civil engineering, Forensic engineering, Electrical engineering, Geography