Partial Dismantlement of the Main Girder of Zhaobaoshan Bridge in Ningbo
Lu Zhong
Abstract
Lu Zhong
Abstract
The construction method and safety technological measures for partial dismantlement of the main girder of Zhaobaoshan bridge in Ningbo.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The construction method and safety technological measures for partial dismantlement of the main girder of Zhaobaoshan bridge in Ningbo.
Key concepts: Bridge (graph theory), Girder, Engineering, Structural engineering, Civil engineering, Forensic engineering, Internal medicine, Medicine