Treatment Technique of the No.3 Runway Foundation of Pudong International Airport
Lihui Zhang
Abstract
Lihui Zhang
Abstract
The construction plan of the No.3 runway foundation of Pudong International Airport was introduced in this paper.The vacuum method and attacking vibrating rolling technique were presented in details.The author not only provided the specific construction process,but also the attentions,which could be the reference for similar projects.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The construction plan of the No.3 runway foundation of Pudong International Airport was introduced in this paper.The vacuum method and attacking vibrating rolling technique were presented in details.The author not only provided the specific construction process,but also the attentions,which could be the reference for similar projects.
Key concepts: Runway, Foundation (evidence), International airport, Plan (archaeology), Engineering, Process (computing), Civil engineering, Forensic engineering