2011Journal of Hydroelectric EngineeringRequires access

Impact of cascade reservoirs construction in the upper Yangtze River on sediment inflow to Three Gorges reservoirs

Xu Quanxi

Open publisher page 8 citations

Abstract

Construction of reservoirs in the upper Yangtze River(Changjiang) has great impact on the incoming flow and sediment conditions of the Three Gorges reservoir(TGR).This paper analyzes the impact of 12000 reservoirs in the upper Yangtze on the sediment inflow to TGR,and predicts the trend of incoming sediment for the case of all the cascade reservoirs at their operation stage.Results show that about 180 millions ton(Mt) of sediment was trapped annually by these reservoirs in 1991-2005 and that about 60.1 Mt /yr and 50 Mt /yr or 33.8% and 27.7% of the total trapped was retained in the Jialing River basin and the Jinsha River basin,respectively.The sediment detention had reduced the TGR incoming sediment by 110 Mt /yr in 1991-2005.Relative to that before 1990,the reduction was increasing by 95.1 Mt /yr on average,or the total reduction in the TGR incoming sediment in this period was increased by 59.9%.With the planned large reservoirs at their operation stage in the near future,the sediment discharge to TGR would most likely be decreased to 90 Mt /yr,which is only 18.3% of the amount observed during 1956-1990.

About this research paper

What this paper is about

Construction of reservoirs in the upper Yangtze River(Changjiang) has great impact on the incoming flow and sediment conditions of the Three Gorges reservoir(TGR).This paper analyzes the impact of 12000 reservoirs in the upper Yangtze on the sediment inflow to TGR,and predicts the trend of incoming sediment for the case of all the cascade reservoirs at their operation stage.Results show that about 180 millions ton(Mt) of sediment was trapped annually by these reservoirs in 1991-2005 and that about 60.1 Mt /yr and 50 Mt /yr or 33.8% and 27.7% of the total trapped was retained in the Jialing River basin and the Jinsha River basin,respectively.The sediment detention had reduced the TGR incoming sediment by 110 Mt /yr in 1991-2005.Relative to that before 1990,the reduction was increasing by 95.1 Mt /yr on average,or the total reduction in the TGR incoming sediment in this period was increased by 59.9%.With the planned large reservoirs at their operation stage in the near future,the sediment discharge to TGR would most likely be decreased to 90 Mt /yr,which is only 18.3% of the amount observed during 1956-1990.

Why it matters

OpenAlex reports 8 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Construction of reservoirs in the upper Yangtze River(Changjiang) has great impact on the incoming flow and sediment conditions of the Three Gorges reservoir(TGR).This paper analyzes the impact of 12000 reservoirs in the upper Yangtze on the sediment inflow to TGR,and predicts the trend of incoming sediment for the case of all the cascade reservoirs at their operation stage.Results show that about 180 millions ton(Mt) of sediment was trapped annually by these reservoirs in 1991-2005 and that about 60.1 Mt /yr and 50 Mt /yr or 33.8% and 27.7% of the total trapped was retained in the Jialing River basin and the Jinsha River basin,respectively.The sediment detention had reduced the TGR incoming sediment by 110 Mt /yr in 1991-2005.Relative to that before 1990,the reduction was increasing by 95.1 Mt /yr on average,or the total reduction in the TGR incoming sediment in this period was increased by 59.9%.With the planned large reservoirs at their operation stage in the near future,the sediment discharge to TGR would most likely be decreased to 90 Mt /yr,which is only 18.3% of the amount observed during 1956-1990.

Key concepts: Sediment, Hydrology (agriculture), Three gorges, Inflow, Structural basin, Yangtze river, Environmental science, Stage (stratigraphy)

Related papers

Back to paper searchBrowse research topicsOriginal source
Impact of cascade reservoirs construction in the upper Yangtze River on sediment inflow to Three Gorges reservoirs — Research Paper | ScholarLens