Study on Waterproofing and Drainage Measures of Jiaozhou Bay Subsea Tunnel
Jing Yongjun
Abstract
Jing Yongjun
Abstract
Compared with mountain tunnels,subsea tunnels face more serious waterproofing and drainage situations.Especially for long tunnels,keeping the tunnel dry and clean is a basic safety requirement.For the design of the waterproofing system of tunnels,the principle of preferential water sealing,limiting drainage,adopting rigid and flexible system simultaneously,multi-waterproofing methods,adjusting waterproofing measures to local conditions and comprehensive is followed.Taking Jiaozhou Bay subsea tunnel as an example,the authors make primary study on the waterproofing and drainage measures,including advance pre-grouting,leaking water treatment after excavation,waterproofing by means of waterproofing membranes and drainage measures.The engineering practice proves that the waterproofing and drainage measures taken are effective.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Compared with mountain tunnels,subsea tunnels face more serious waterproofing and drainage situations.Especially for long tunnels,keeping the tunnel dry and clean is a basic safety requirement.For the design of the waterproofing system of tunnels,the principle of preferential water sealing,limiting drainage,adopting rigid and flexible system simultaneously,multi-waterproofing methods,adjusting waterproofing measures to local conditions and comprehensive is followed.Taking Jiaozhou Bay subsea tunnel as an example,the authors make primary study on the waterproofing and drainage measures,including advance pre-grouting,leaking water treatment after excavation,waterproofing by means of waterproofing membranes and drainage measures.The engineering practice proves that the waterproofing and drainage measures taken are effective.
Key concepts: Waterproofing, Subsea, Drainage, Geotechnical engineering, Excavation, Engineering, Underwater, Limiting