Discussion on "4A-3S-2E-1H" Safety Standardization Construction of Large Environmental Protection Enterprises
Zhuang Fusheng
Abstract
Zhuang Fusheng
Abstract
As the first assembled solid wastes treatment and pollution control center in Shanghai,based on the requirements of safety standardization construction of state administration of work safety and combined with the safety management demands of whole process,Shanghai solid wastes disposal center puts forward the concept of 4A-3S-2E-1H safety standardization construction of large environmental protection enterprises.In addition,the experiences of 4A-3S-2E-1H safety standardization construction are comprehensively summarized,which has certain reference significance for safety standardization construction in large environmental protection enterprises.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
As the first assembled solid wastes treatment and pollution control center in Shanghai,based on the requirements of safety standardization construction of state administration of work safety and combined with the safety management demands of whole process,Shanghai solid wastes disposal center puts forward the concept of 4A-3S-2E-1H safety standardization construction of large environmental protection enterprises.In addition,the experiences of 4A-3S-2E-1H safety standardization construction are comprehensively summarized,which has certain reference significance for safety standardization construction in large environmental protection enterprises.
Key concepts: Standardization, Work (physics), Environmental safety, Business, Process (computing), Risk analysis (engineering), Work safety, Environmental pollution