The surrounding rock of Dawangding tunnel has characteristics of soft and fragment,shallow buried depth,many difficult construction steps and easy collapse.In order to ensure a successful and safe construction in the bad geological conditions,choosing the K43+842 near the left exit of the tunnel as the typical fault surface,FLAC is used to build the numerical simulation model.And then the effect on the surrounding rock displacement and the plastic zone size of four construction methods including full section method,top and bottom shoulder method,three shoulder method,double pilot tunnel method are analyzed and compared.The results show that the total control effect on surrounding rock displacement and the construction quality with double pilot tunnel method is the best and this method is fit for the construction of Dawangding tunnel in the V-level surrounding rock shallow-buried section.

About this research paper

What this paper is about

The surrounding rock of Dawangding tunnel has characteristics of soft and fragment,shallow buried depth,many difficult construction steps and easy collapse.In order to ensure a successful and safe construction in the bad geological conditions,choosing the K43+842 near the left exit of the tunnel as the typical fault surface,FLAC is used to build the numerical simulation model.And then the effect on the surrounding rock displacement and the plastic zone size of four construction methods including full section method,top and bottom shoulder method,three shoulder method,double pilot tunnel method are analyzed and compared.The results show that the total control effect on surrounding rock displacement and the construction quality with double pilot tunnel method is the best and this method is fit for the construction of Dawangding tunnel in the V-level surrounding rock shallow-buried section.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The surrounding rock of Dawangding tunnel has characteristics of soft and fragment,shallow buried depth,many difficult construction steps and easy collapse.In order to ensure a successful and safe construction in the bad geological conditions,choosing the K43+842 near the left exit of the tunnel as the typical fault surface,FLAC is used to build the numerical simulation model.And then the effect on the surrounding rock displacement and the plastic zone size of four construction methods including full section method,top and bottom shoulder method,three shoulder method,double pilot tunnel method are analyzed and compared.The results show that the total control effect on surrounding rock displacement and the construction quality with double pilot tunnel method is the best and this method is fit for the construction of Dawangding tunnel in the V-level surrounding rock shallow-buried section.

Key concepts: Displacement (psychology), Computer simulation, Geotechnical engineering, Structural engineering, Tunnel construction, Geology, Section (typography), Engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Numerical Simulation of Optimization Construction Method for Soft and Fragmented Surrounding Rock Segment of Tunnel — Research Paper | ScholarLens