The construction technique for closure of the central span and side spans of steel box girder cable-stayed bridge was introduced,against the background of the main bridge of the north bridge of Xiamen-Zhangzhou Sea-Crossing Bridge,which is a five-span continuous steel box girder cable-stayed bridge of half-floating system with a main span of 780 m,and with span arrangement of(95+230+780+230+95) m.The bridge accommodates six traffic lanes and the full width of the box girder is 38 m.In the closure construction of the girder sections over the auxiliary pier and the transitional pier in the side spans,the closure method of cantilever assembling construction was adopted,which made it possible to reduce the difficulty of the closure.During the closure of the central span,the match-cutting closure method with incremental launching assisting measures was used,considering the effects of temperature and incremental launching force.In the construction process of the whole bridge,the unstressed state control method was adopted to do construction monitoring and control.
OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The construction technique for closure of the central span and side spans of steel box girder cable-stayed bridge was introduced,against the background of the main bridge of the north bridge of Xiamen-Zhangzhou Sea-Crossing Bridge,which is a five-span continuous steel box girder cable-stayed bridge of half-floating system with a main span of 780 m,and with span arrangement of(95+230+780+230+95) m.The bridge accommodates six traffic lanes and the full width of the box girder is 38 m.In the closure construction of the girder sections over the auxiliary pier and the transitional pier in the side spans,the closure method of cantilever assembling construction was adopted,which made it possible to reduce the difficulty of the closure.During the closure of the central span,the match-cutting closure method with incremental launching assisting measures was used,considering the effects of temperature and incremental launching force.In the construction process of the whole bridge,the unstressed state control method was adopted to do construction monitoring and control.
Key concepts: Span (engineering), Bridge (graph theory), Closure (psychology), Structural engineering, Pier, Engineering, Box girder, Girder