The Measures Taken By Tianqiao Hydroelectric Power Plant toEliminate the Effects Caused By Peaking Rcgulation of Wanjiazhai Hydroelectric Power Plant
Liu Shou
Abstract
Liu Shou
Abstract
The Wanjiazhai hydropower project has changed the natural condition of the yellow river, and has effects on regular running and management of Tianqiao hydroelectric power plant, the paper analyes the measures which should be taken by Tianqiao hydroelectric power plant, and gives advices to the optimization and overall planning of the management of the electric network.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The Wanjiazhai hydropower project has changed the natural condition of the yellow river, and has effects on regular running and management of Tianqiao hydroelectric power plant, the paper analyes the measures which should be taken by Tianqiao hydroelectric power plant, and gives advices to the optimization and overall planning of the management of the electric network.
Key concepts: Hydroelectricity, Hydropower, Hydro power, Power station, Operational planning, Engineering, Electric power, Power (physics)