Workover of wells with broken casing in Wenweima Oilfield

HE Yunzhang

Open publisher page 0 citations

Abstract

Workover technology for wells with broken casing is the current bottleneck restricting normal development of oilfields.Workover test is conducted on Φ139.7 mm inch casing in Wenweima Oilfield,three types of workover practice are conducted including the technology for workover of eccentric casing pulling machine,the technology for opening bell at the broken casing in short washover tool,and centralization of wells with broken casing.Field test shows that the three technologies significantly increase the success ratio of workover of wells with broken casing,they are easy to use,having short cycle and low cost.

About this research paper

What this paper is about

Workover technology for wells with broken casing is the current bottleneck restricting normal development of oilfields.Workover test is conducted on Φ139.7 mm inch casing in Wenweima Oilfield,three types of workover practice are conducted including the technology for workover of eccentric casing pulling machine,the technology for opening bell at the broken casing in short washover tool,and centralization of wells with broken casing.Field test shows that the three technologies significantly increase the success ratio of workover of wells with broken casing,they are easy to use,having short cycle and low cost.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Workover technology for wells with broken casing is the current bottleneck restricting normal development of oilfields.Workover test is conducted on Φ139.7 mm inch casing in Wenweima Oilfield,three types of workover practice are conducted including the technology for workover of eccentric casing pulling machine,the technology for opening bell at the broken casing in short washover tool,and centralization of wells with broken casing.Field test shows that the three technologies significantly increase the success ratio of workover of wells with broken casing,they are easy to use,having short cycle and low cost.

Key concepts: Workover, Casing, Petroleum engineering, Geology, Engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Workover of wells with broken casing in Wenweima Oilfield — Research Paper | ScholarLens