2009•Rock and Soil MechanicsRequires access

Research on partial pressure joint arch tunnel's dynamic simulation and optimum analysis of construction process

Junwei Li

Open publisher page 1 citations

Abstract

In order to simulate and make optimum analysis of partial pressure joint arch tunnel, a 3D finite element model is established.The simulation results are compared with the measured data in site.Arch crown settlement, stress and displacement of middle wall, plastic area distribution of surrounding rock, and variation of initial and secondary linings are analyzed.Then, the joint arch tunnel's optimal construction sequence, the optimal construction space of two holes, the suitable construction method of cutting face and cycle length are determined by the simulation.The results provide a scientific basis and technical guidance for the construction optimization of partial pressure joint arch tunnel.

About this research paper

What this paper is about

In order to simulate and make optimum analysis of partial pressure joint arch tunnel, a 3D finite element model is established.The simulation results are compared with the measured data in site.Arch crown settlement, stress and displacement of middle wall, plastic area distribution of surrounding rock, and variation of initial and secondary linings are analyzed.Then, the joint arch tunnel's optimal construction sequence, the optimal construction space of two holes, the suitable construction method of cutting face and cycle length are determined by the simulation.The results provide a scientific basis and technical guidance for the construction optimization of partial pressure joint arch tunnel.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In order to simulate and make optimum analysis of partial pressure joint arch tunnel, a 3D finite element model is established.The simulation results are compared with the measured data in site.Arch crown settlement, stress and displacement of middle wall, plastic area distribution of surrounding rock, and variation of initial and secondary linings are analyzed.Then, the joint arch tunnel's optimal construction sequence, the optimal construction space of two holes, the suitable construction method of cutting face and cycle length are determined by the simulation.The results provide a scientific basis and technical guidance for the construction optimization of partial pressure joint arch tunnel.

Key concepts: Arch, Joint (building), Structural engineering, Finite element method, Engineering, Settlement (finance), Displacement (psychology), Geotechnical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Research on partial pressure joint arch tunnel's dynamic simulation and optimum analysis of construction process — Research Paper | ScholarLens