A Brief Analysis of the Construction Quality Control Measures of Mountainous Highway Subgrade Filling
Zhang Hai-bi
Abstract
Zhang Hai-bi
Abstract
Jing Cheng Highway(Mi Yun Shayugou Highway—city bounded section)engineering is not only the most difficult period of highway construction in terms of survey,design,and construction in Beijing in the past ten years,but also the longest mountainous area highway of the city.In view of the typical mountainous terrain and complicated structures,the focus of this highway engineering is the quality of the subgrade filling construction.This article is to illustrate some relative construction quality control measures of mountainous highway subgrade filling.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Jing Cheng Highway(Mi Yun Shayugou Highway—city bounded section)engineering is not only the most difficult period of highway construction in terms of survey,design,and construction in Beijing in the past ten years,but also the longest mountainous area highway of the city.In view of the typical mountainous terrain and complicated structures,the focus of this highway engineering is the quality of the subgrade filling construction.This article is to illustrate some relative construction quality control measures of mountainous highway subgrade filling.
Key concepts: Subgrade, Beijing, Civil engineering, Highway engineering, Terrain, Quality (philosophy), Engineering, Transport engineering