Treatment and Construction Technology to Highslope Slump of Expressway in Liaoning East Mountain Region
Peng Jia
Abstract
Peng Jia
Abstract
In the flood season of this year,slumping occurred in the K158+500 cutting section of Danfu Expressway.After analyzing the causes of slump,staged treatment scheme was adopted to treat the unstable slope,which make the slope reach to natural stable state after treatment.The treatment scheme and construction technology to slope slump of Danfu Expressway are stated.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
In the flood season of this year,slumping occurred in the K158+500 cutting section of Danfu Expressway.After analyzing the causes of slump,staged treatment scheme was adopted to treat the unstable slope,which make the slope reach to natural stable state after treatment.The treatment scheme and construction technology to slope slump of Danfu Expressway are stated.
Key concepts: Slumping, Slump, Flood myth, Geotechnical engineering, Slope failure, Geology, Engineering, Mining engineering