Soil nailing wall withprestressed anchor in deep foundation pit in the joint application
Zhang Rongcai
Abstract
Zhang Rongcai
Abstract
Soil nailing and anchor bolt in deep foundation pit in Jingdong combined application,this method can largely reduce the engineering cost,cost savings,in the project using the method to finish the14 meters of deep foundation pit support engineering.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Soil nailing and anchor bolt in deep foundation pit in Jingdong combined application,this method can largely reduce the engineering cost,cost savings,in the project using the method to finish the14 meters of deep foundation pit support engineering.
Key concepts: Soil nailing, Foundation (evidence), Engineering, Joint (building), Geotechnical engineering, Civil engineering, Mining engineering, Retaining wall