2008Journal of Chang'an UniversityRequires access

Quality control for aggregate handling in asphalt pavement construction

Liang Xi-san

Open publisher page 2 citations

Abstract

The traditional aggregate handling method has the defects of poor quality in processing and low rate of qualified aggregate in highway construction in China.This paper investigated the sieve sizes for aggregate handling and the variation of aggregate gradation from more than 30 sections of the asphalt pavement construction.And it found and used a set of standardized sieve sizes for aggregate handling on a large scale processing.It is pointed out that the relationship between the sieve sizes for aggregate handling and the standard sieve sizes should be controlled.The relationship between the aggregate specifications and the sieve sizes for aggregate handling and the relationship between the sort of mix and the aggregate specifications are put forward.The applications result showed that the qualified rate of the aggregate is 100%,and the variation of aggregate gradation is less than 2.7%.6 tabs,10 refs.

About this research paper

What this paper is about

The traditional aggregate handling method has the defects of poor quality in processing and low rate of qualified aggregate in highway construction in China.This paper investigated the sieve sizes for aggregate handling and the variation of aggregate gradation from more than 30 sections of the asphalt pavement construction.And it found and used a set of standardized sieve sizes for aggregate handling on a large scale processing.It is pointed out that the relationship between the sieve sizes for aggregate handling and the standard sieve sizes should be controlled.The relationship between the aggregate specifications and the sieve sizes for aggregate handling and the relationship between the sort of mix and the aggregate specifications are put forward.The applications result showed that the qualified rate of the aggregate is 100%,and the variation of aggregate gradation is less than 2.7%.6 tabs,10 refs.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The traditional aggregate handling method has the defects of poor quality in processing and low rate of qualified aggregate in highway construction in China.This paper investigated the sieve sizes for aggregate handling and the variation of aggregate gradation from more than 30 sections of the asphalt pavement construction.And it found and used a set of standardized sieve sizes for aggregate handling on a large scale processing.It is pointed out that the relationship between the sieve sizes for aggregate handling and the standard sieve sizes should be controlled.The relationship between the aggregate specifications and the sieve sizes for aggregate handling and the relationship between the sort of mix and the aggregate specifications are put forward.The applications result showed that the qualified rate of the aggregate is 100%,and the variation of aggregate gradation is less than 2.7%.6 tabs,10 refs.

Key concepts: Gradation, Aggregate (composite), Sieve analysis, Sieve (category theory), Asphalt, Asphalt pavement, Quality (philosophy), Engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Quality control for aggregate handling in asphalt pavement construction — Research Paper | ScholarLens