Key Construction Technique of Yesanhe Special Big Bridge
Peng Ling-li
Abstract
Peng Ling-li
Abstract
According to Yesanhe Special Big Bridge construction characteristics,the reasonable construction technique measures towards mass concrete,solid pier,0# high-strengthed concrete with high aspect ratio are introduced.So as to solve the hard construction problem the main beam,two temporary construction cable bridge between 2# and 3# pier,4# and 5# pier,the influence of construction cable bridge on main bridge is analyzed.It can provide reference for similar engineerings.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
According to Yesanhe Special Big Bridge construction characteristics,the reasonable construction technique measures towards mass concrete,solid pier,0# high-strengthed concrete with high aspect ratio are introduced.So as to solve the hard construction problem the main beam,two temporary construction cable bridge between 2# and 3# pier,4# and 5# pier,the influence of construction cable bridge on main bridge is analyzed.It can provide reference for similar engineerings.
Key concepts: Pier, Bridge (graph theory), Engineering, Key (lock), Beam bridge, Structural engineering, Civil engineering, Computer science