A DISCUSSION ON SOME PROBLEMS IN APPLYING EMS TO REGIONAL POWER NETWORK
Fan Chun
Abstract
Fan Chun
Abstract
After the implementation of applying SCADA systems to region power network, it begins to built up the EMS for regional power network. The usability, practicability and reliability are the important indices in the judgment of the performance of EMS. Because the basic automation level in regional power network is weaker than that in provincial power network, therefore, it leads to that it is difficult to implement and apply power system application software (PAS) in regional power network, so that the implementation project and the functions of PAS for regional power network should be different to that for provincial power network and above. According to the practice in Taiyuan Power Supply Bureau the features, current situation, necessity, principle of implementation and obstruction of applying PAS to regional power network are put forward, and the suggestions on the concrete improvement and application of several functional modules in PAS suitable to regional power network, e.g., network topology, state estimation, load forecasting, on line power flow, security analysis, reactive power optimization and short current calculation, etc., are given.
OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
After the implementation of applying SCADA systems to region power network, it begins to built up the EMS for regional power network. The usability, practicability and reliability are the important indices in the judgment of the performance of EMS. Because the basic automation level in regional power network is weaker than that in provincial power network, therefore, it leads to that it is difficult to implement and apply power system application software (PAS) in regional power network, so that the implementation project and the functions of PAS for regional power network should be different to that for provincial power network and above. According to the practice in Taiyuan Power Supply Bureau the features, current situation, necessity, principle of implementation and obstruction of applying PAS to regional power network are put forward, and the suggestions on the concrete improvement and application of several functional modules in PAS suitable to regional power network, e.g., network topology, state estimation, load forecasting, on line power flow, security analysis, reactive power optimization and short current calculation, etc., are given.
Key concepts: Power network, SCADA, Power (physics), Electric power system, Regional power, Reliability (semiconductor), Computer science, Reliability engineering