Jacking Construction of a Three-spans Continuous Frame-structure Railway Bridge on Bedrock
Liu Gao
Abstract
Liu Gao
Abstract
In this article, the author introduces the jacking construction of a threespans continuous railway bridge of the Heri doublelines railway, and states construction techniques, strengthening methods and protection technologies of largespan and multispans jacking bridges under complex geological conditions.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
In this article, the author introduces the jacking construction of a threespans continuous railway bridge of the Heri doublelines railway, and states construction techniques, strengthening methods and protection technologies of largespan and multispans jacking bridges under complex geological conditions.
Key concepts: Jacking, Bridge (graph theory), Engineering, Bedrock, Span (engineering), Frame (networking), Structural engineering, Civil engineering