During the construction of deep foundation pits of subway,because of the engineering geological conditions and environment,the deformation rules of the deep foundation pits greatly differ.A deep foundation pit is taken as an example.Based on the actual monitoring data of the deformation of row pile retaining structures,the deformation rules of the retaining structures during every construction stage of the deep foundation pit are analyzed by means of numerical simulations.The results indicate that at the beginning of excavating the foundation pit,the curve of retaining piles linearly changes.With the excavation of foundation pit and the erection of steel braces,the curve is in the shape of bow.The maximum horizontal displacement happens at the 2/3 depth of the pit.It can provide the reference for the optimization design and scientific construction of similar deep foundation pits.

About this research paper

What this paper is about

During the construction of deep foundation pits of subway,because of the engineering geological conditions and environment,the deformation rules of the deep foundation pits greatly differ.A deep foundation pit is taken as an example.Based on the actual monitoring data of the deformation of row pile retaining structures,the deformation rules of the retaining structures during every construction stage of the deep foundation pit are analyzed by means of numerical simulations.The results indicate that at the beginning of excavating the foundation pit,the curve of retaining piles linearly changes.With the excavation of foundation pit and the erection of steel braces,the curve is in the shape of bow.The maximum horizontal displacement happens at the 2/3 depth of the pit.It can provide the reference for the optimization design and scientific construction of similar deep foundation pits.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

During the construction of deep foundation pits of subway,because of the engineering geological conditions and environment,the deformation rules of the deep foundation pits greatly differ.A deep foundation pit is taken as an example.Based on the actual monitoring data of the deformation of row pile retaining structures,the deformation rules of the retaining structures during every construction stage of the deep foundation pit are analyzed by means of numerical simulations.The results indicate that at the beginning of excavating the foundation pit,the curve of retaining piles linearly changes.With the excavation of foundation pit and the erection of steel braces,the curve is in the shape of bow.The maximum horizontal displacement happens at the 2/3 depth of the pit.It can provide the reference for the optimization design and scientific construction of similar deep foundation pits.

Key concepts: Foundation (evidence), Pile, Geotechnical engineering, Deformation (meteorology), Excavation, Engineering, Displacement (psychology), Geology

Related papers

Back to paper searchBrowse research topicsOriginal source
Deformation of row pile retaining structures for deep foundation pit of subway — Research Paper | ScholarLens