2005Unpublished venueRequires access

RF power test and conditioning of the new accelerating structures for the BEPC II-Linac

侯汨, Zusheng Zhou, Haishan Mi, Zusheng Zhou

Open publisher page 2 citations

Abstract

The Beijing Electron Positron Collider Upgrade Project ( BEPC II) requires its injector linac to upgrade the beam energy and current. Thus the accelerating structures in the positron production region must be newly designed and constructed to meet the high gradient demand. These new structures must be tested and conditioned with the high RF power before their installation into the linac tunnel. This paper describes the design and construction of the high power RF test stand, the tuning of the RF Power source, the progress and the final results of the RF test and conditioning.

About this research paper

What this paper is about

The Beijing Electron Positron Collider Upgrade Project ( BEPC II) requires its injector linac to upgrade the beam energy and current. Thus the accelerating structures in the positron production region must be newly designed and constructed to meet the high gradient demand. These new structures must be tested and conditioned with the high RF power before their installation into the linac tunnel. This paper describes the design and construction of the high power RF test stand, the tuning of the RF Power source, the progress and the final results of the RF test and conditioning.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The Beijing Electron Positron Collider Upgrade Project ( BEPC II) requires its injector linac to upgrade the beam energy and current. Thus the accelerating structures in the positron production region must be newly designed and constructed to meet the high gradient demand. These new structures must be tested and conditioned with the high RF power before their installation into the linac tunnel. This paper describes the design and construction of the high power RF test stand, the tuning of the RF Power source, the progress and the final results of the RF test and conditioning.

Key concepts: Upgrade, Linear particle accelerator, Physics, Collider, Injector, RF power amplifier, Nuclear engineering, Particle accelerator

Related papers

Back to paper searchBrowse research topicsOriginal source
RF power test and conditioning of the new accelerating structures for the BEPC II-Linac — Research Paper | ScholarLens