On construction craft of bored piles
LI Pei-ju
Abstract
LI Pei-ju
Abstract
The paper has the detailed introduction on the construction craft of the bored piles,illustrates the three key procedures,including the drilling construction of the drilled piles,the process and manufacture of the reinforced cage and the grouting concrete construction,and points out the construction points and precautions for the procedures,so as to direct the practice.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The paper has the detailed introduction on the construction craft of the bored piles,illustrates the three key procedures,including the drilling construction of the drilled piles,the process and manufacture of the reinforced cage and the grouting concrete construction,and points out the construction points and precautions for the procedures,so as to direct the practice.
Key concepts: Craft, Pile, Drilling, Engineering, Forensic engineering, Construction engineering, Civil engineering, Geotechnical engineering