2013Coal science and technologyRequires access

Application of High Efficient Gas Drainage Technology with Double Casing Pipe to Mining Seam

Haiqing Zhang

Open publisher page 2 citations

Abstract

In order to solve the technical difficult problems of the low drainage gas flow,low gas content,easy borehole collapsing and difficult borehole sealing in the gas drainage borehole of the mining seam,the paper analyzed the shortages of the available gas drainage technology.According to the actual condition of the transportation gateway in F15-13330 coal mining face of No.8 Mine of Pingdingshan Tianan Coal Company Ltd.,a high efficient gas drainage technology with double casing pipe was provided in the mining seam.The paper studied on the function principle of the gas drainage with the double casing pipe and the rational length of the double casing pipe and others.The site application results showed that in the borehole gas drainage in the mining seam with the seam Protodyakonov coefficient f≥0.25,the high efficient gas drainage technology with the double casing pipe applied could effectively prevent the borehole collapsing and jammed and improve the sealing quality of the borehole.The average initial volume fraction of the gas drainage with sigle borehole was up to 89%,the pure gas flow value was improved by 80% and the gas drainage flow value only reduced by 12% after drainaged 31 days.The gas volume fraction of drainage pipe in test face kept over 18%,the gas drainage rate in coal seam of the mining face reached to 45%.

About this research paper

What this paper is about

In order to solve the technical difficult problems of the low drainage gas flow,low gas content,easy borehole collapsing and difficult borehole sealing in the gas drainage borehole of the mining seam,the paper analyzed the shortages of the available gas drainage technology.According to the actual condition of the transportation gateway in F15-13330 coal mining face of No.8 Mine of Pingdingshan Tianan Coal Company Ltd.,a high efficient gas drainage technology with double casing pipe was provided in the mining seam.The paper studied on the function principle of the gas drainage with the double casing pipe and the rational length of the double casing pipe and others.The site application results showed that in the borehole gas drainage in the mining seam with the seam Protodyakonov coefficient f≥0.25,the high efficient gas drainage technology with the double casing pipe applied could effectively prevent the borehole collapsing and jammed and improve the sealing quality of the borehole.The average initial volume fraction of the gas drainage with sigle borehole was up to 89%,the pure gas flow value was improved by 80% and the gas drainage flow value only reduced by 12% after drainaged 31 days.The gas volume fraction of drainage pipe in test face kept over 18%,the gas drainage rate in coal seam of the mining face reached to 45%.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In order to solve the technical difficult problems of the low drainage gas flow,low gas content,easy borehole collapsing and difficult borehole sealing in the gas drainage borehole of the mining seam,the paper analyzed the shortages of the available gas drainage technology.According to the actual condition of the transportation gateway in F15-13330 coal mining face of No.8 Mine of Pingdingshan Tianan Coal Company Ltd.,a high efficient gas drainage technology with double casing pipe was provided in the mining seam.The paper studied on the function principle of the gas drainage with the double casing pipe and the rational length of the double casing pipe and others.The site application results showed that in the borehole gas drainage in the mining seam with the seam Protodyakonov coefficient f≥0.25,the high efficient gas drainage technology with the double casing pipe applied could effectively prevent the borehole collapsing and jammed and improve the sealing quality of the borehole.The average initial volume fraction of the gas drainage with sigle borehole was up to 89%,the pure gas flow value was improved by 80% and the gas drainage flow value only reduced by 12% after drainaged 31 days.The gas volume fraction of drainage pipe in test face kept over 18%,the gas drainage rate in coal seam of the mining face reached to 45%.

Key concepts: Casing, Borehole, Drainage, Petroleum engineering, Coal mining, Mining engineering, Coal, Geology

Related papers

Back to paper searchBrowse research topicsOriginal source
Application of High Efficient Gas Drainage Technology with Double Casing Pipe to Mining Seam — Research Paper | ScholarLens